Laserfiche WebLink
State Farm• <br /> Y3_29W8-523 <br /> 1-IY LEN, PATI'I <br /> Time & Material Breakdown <br /> General Contractor O&P Items _ Quantity Unit P`rlcwle Total Cost <br /> CLEANING <br /> Contractorl_abor- 41 HR 29.830 71.93* <br /> Cleaning Technician 1.00 EA 2.650 2,65 <br /> Labor for Cleaning labor minimum <br /> Labor: 74.58 <br /> Miscellaneous: 13.48 <br /> CLEANING Subtotal: 88.06 <br /> GENERAL DEMOLITION <br /> Contractor Labor- <br /> 1.81 HR 44.400 80.24' <br /> Demolition Laborer <br /> Labor: 80.24 <br /> Equipment 0.50 50.000 25.00 <br /> Landfill charge-per ton 0.05 WK 411.600 18.62"` <br /> 1/2 or 3/4 ton pickup <br /> Equipment: 43.62 <br /> GENERAL DEMOLITION Subtotal: 123.86 <br /> DRYWALL <br /> Material- 37.51 SF 0.300 11.25 <br /> Gypsum board, 1/2" 1.77 LF 0.214 0.38 <br /> Metal corner bead 0.11 BX 10.990 1.22* <br /> Drywall joint compound- 50 lb box 0 0.15 <br /> .83 <br /> 1 <br /> Drywall nails(based on 25 to 50 lb box) 0.08 LB 0.17 LB 1.830 0.34 <br /> Drywall screws-grabber-(based on 25 to 50 Ib box) 0.02 RL 4.870 0.10 <br /> Perfotape-500'roll 13.44 <br /> Material: <br /> Contractor Labor- 0.27 HR 44.400 11.84* <br /> Demolition Laborer 0.57 HR 57.450 32.64* <br /> Drywall Installer/Finisher 1.00 EA 214.300 21430 <br /> Labor for Drywall labor minimum <br /> Labor: 258.78 <br /> DRYWALL Subtotal: 272.22 <br /> ELE <br /> Contractor Labor 1.00 EA 85.530 85.53 <br /> Labor for Electrical labor minimum <br /> Labor: 85.53 <br /> ELE Subtotal: 85.53 <br /> FINISH CARPENTRY/TRIMWORK <br /> Material - x,12 LB 2.330 4.95" <br /> 6d finish nails(based on 5 lb box) <br /> ----- <br /> Material; 4.95 <br /> Cotltractor Labor 8.04 HR 68.950 534.36* <br /> Carpenter-Finish,Trim/Cabinet <br /> Page: 12 <br /> Date: 3/25/2014 10:29 AM <br /> Z L abed EE9Z-LZt-E9L Xed dH NdOS:1.0 1602 91 Jdt/ <br />