My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013 - 00346 - land alteration
Orono
>
Property Files
>
Street Address
>
W
>
Wildhurst Trail
>
0999 Wildhurst Trail - 07-117-23-21-0005
>
Permits/Inspections
>
2013 - 00346 - land alteration
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:16:25 PM
Creation date
2/5/2020 9:21:34 AM
Metadata
Fields
Template:
x Address Old
Address
0999 Wildhurst Tr
Document Type
Permits/Inspections
PIN
0711723210005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date: Fri, Mar 29, 2013 at 1:13 PM <br /> Subject: 999 Wildhurst Trail <br /> To: "dianebgray@gmail.com" <dianebgray@gmail.com> <br /> Diane, <br /> Per our conversation yesterday, the property addressed 999 Wildhurst Trial is located in the LR-1 B <br /> zoning district. This property is also within Tier 1 of the Stormwater Quality Overlay District which <br /> allows hardcover up to 25% of the lot area. Modification of a driveway requires a Zoning Permit, a <br /> copy of the application is attached. The type of permits you will need to request on the Zoning Permit <br /> Application form are a Hardcover Permit and a Minor Land Alteration; check both boxes. A minor land <br /> alteration permit is $50, plus a $2,000 escrow as indicated. An as-built survey will be required after <br /> the driveway modifications have been completed and inspected, showing the driveway and grading <br /> were completed per the approved plan and the hardcover is conforming. <br /> I spoke with Lyle Oman (our building official), he indicated that you removed two decks which you <br /> intend to rebuild in-kind. However past surveys and permit information only show one of the two <br /> decks. After Lyle receives the construction plans for the decks, he will determine if a survey will be <br /> required prior to construction of the decks. An as-built survey showing the completed decks may also <br /> be required. Building permit costs are based on the estimated construction value. For an estimate of <br /> the permit fee for the construction of decks, please call 952-249-4600. <br /> Christine Mattson <br /> Planning Assistant <br /> City of Orono <br /> 2750 Kelly Parkway Orono MN 55356 (physical address) <br /> PO Box 66 Crystal Bay MN 55323-0066 (mailing address) <br /> `t 952.249.4620 g 952.249.4616 <br /> D 4 cmattson@ci.orono.mn.us ' www.ci.orono.mn.us <br /> Office Hours: Monday - Friday 8 am to 4:30 pm <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.