My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-21-2012 - const. w/o permit
Orono
>
Property Files
>
Street Address
>
W
>
Wildhurst Trail
>
0975 Wildhurst Tr - 07-117-23-12-0002
>
Correspondence
>
02-21-2012 - const. w/o permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:16:09 PM
Creation date
2/4/2020 9:51:34 AM
Metadata
Fields
Template:
x Address Old
Address
0975 Wildhurst Tr
Document Type
Correspondence
PIN
0711723120002
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 21, 2012 <br /> 975 Wildhurst Trail <br /> Page 5 of 6 <br /> (c) Future improvements. The following items shall be included in hardcover calculations regardless <br /> of whether they are proposed to be construction at the time of building permit application: <br /> (1) Proof of a two-car garage (detached or attached). <br /> (2) For all garages a driveway, subject to the standards in paragraph (d) of this section. <br /> (3) A 24 inch wide sidewalk from the front door to the driveway. <br /> (4) The minimum stairway or landing at all exterior doors as required by the building code. <br /> (d) Driveways. All driveways shall comply with the following minimum dimensional standards: <br /> (1) Driveways serving end loading garages shall maintain a driveway apron with minimum <br /> width equal to the width of the overhead door(s). <br /> For purposes of this section, a driveway apron is that portion of a driveway that extends <br /> 15 feet from the garage door(s) on an end loading garage. <br /> (2) Driveways serving side loading garages shall provide a minimum turn around or back up <br /> depth of 20 feet, as measured from the garage door(s). <br /> (3) Minimum driveway taper ratio shall be 2:1. <br /> (4) Driveways shall be at least eight feet in width at the street or private road. <br /> (5) A turnaround shall be provided for a driveway with direct access to an arterial or collector <br /> roadway, or for a side load garage as determined necessary by the city planner. The <br /> minimum dimensions of the turnaround shall be eight feet in width by 12 feet in depth. <br /> (6) "Wheel strip" driveways are allowed, but the entire width of the driveway (from outside to <br /> outside of the strips)will be considered hardcover. <br /> The following drawing is included for illustrative purposes: [Drawing 3]. <br /> 8' <br /> Backup Apron <br /> (If Required) <br /> • / / ' / ' // 8'x8'Minimum <br /> Garage <br /> / a <br /> 4 <br /> Side Load E o, <br /> E A <br /> C7 <br /> ' Apron Depth 20'Min. <br /> End Load / <br /> / 4'Rad <br /> (Min) <br /> Minimum Width of 1 <br /> Garage Door IT <br /> og B <br /> o in U <br /> Minimum Taper I Driveway Width <br /> 2:1 2E 8'Minimum <br /> f <br /> (20'Maximum) <br /> Driveway Width . 1 ,� <br /> 8'Minimum <br /> 5'Rad. i 5'Rad.-7 <br /> (20'Maximum) --o—i Edge of Right Of-Way <br /> (Lot Une) <br /> i r <br /> Minimum Driveway Standards <br />
The URL can be used to link to this page
Your browser does not support the video tag.