Laserfiche WebLink
.. OSTP Pressure Distribution <br /> ikitMinnesota Pollution UNIVERSITY <br /> Design Worksheet OF MINNESOTA 'Z\� <br /> Control Agency <br /> 12. Calculate the Square Feet per Perforation. Recommended value is 4-11 ft2 per perforation. <br /> Does not apply to At-Grades <br /> a. Bed Area = Bed Width (ft) X Bed Length (ft) <br /> 10 ft X 50 ft = 500 ft2 <br /> b. Square Foot per Perforation = Bed Area divided by the Total Number of Perforations. <br /> 500 ft2 ÷ 51 perforations = 9.8 ft2/perforations <br /> 13. Select Minimum Average Head: 1.0 ft <br /> 14. Select Perforation Discharge (GPM) based on Table: 0.74 GPM per Perforation <br /> 15. Determine required Flow Rate by multiplying the Total Number of Perfs. by the Perforation Discharge. <br /> 51 Perfs X 0.74 GPM per Perforation = 38 GPM <br /> 16. Volume of Liquid Per Foot of Distribution Piping (Table 11): 0.170 Gallons/ft <br /> 17. Volume of Distribution Piping = <br /> Table II <br /> = [Number of Perforated Laterals X Length of Laterals X (Volume of Volume of Liquid in <br /> Liquid Per Foot of Distribution Piping] Pipe <br /> Pipe Liquid <br /> 3 X 48 ft X 0.170 gal/ft = 24.5 Gallons Diameter Per Foot <br /> (inches) (Gallons) <br /> 18. Minimum Delivered Volume = Volume of Distribution Piping X 4 1 0.045 ' <br /> 1.25 0.078 <br /> 24.5 gals X 4 = 97.9 Gallons 1.5 0.110 <br /> 2 0.170 <br /> manifold pipe N 3 0.380 <br /> l I 4 0.661 <br /> i <br /> -Cleanouts —— <br /> pipe from pump _ <br /> V Manifold pipe, J <br /> clean out - 2 J <br /> V 4 i - <br /> �• -4----, <br /> �, J <br /> 1.� alternate location - �/�_ <br /> of pipe from pump �.1t./`Alternate location <br /> ` of pipe from pump <br /> Pipe from pump <br /> Comments/Special Design Considerations: <br />