My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998 - GME consult. inc - recom. for retaining wall
Orono
>
Property Files
>
Street Address
>
W
>
West Farm Road
>
1770 West Farm Road - 27-118-23-44-0017
>
Correspondence
>
1998 - GME consult. inc - recom. for retaining wall
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:23:24 PM
Creation date
1/27/2020 8:59:53 AM
Metadata
Fields
Template:
x Address Old
House Number
1770
Street Name
West Farm
Street Type
Road
Address
1770 West Farm Road
Document Type
Correspondence
PIN
2711823440017
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMBER OF <br /> HUESKER inc. GEOSYNTHETIC <br /> RESEARCH <br /> INSTITUTE <br /> Fill Placement <br /> The reinforced fill should be placed as shown in the construction plans in 6-8 inch lifts <br /> and compacted to a minimum 98% of Standard Proctor Density (ASTM D-698). <br /> Backfill shall be placed, spread, and compacted in such a manner that eliminates the <br /> development of wrinkles and/or movement of the geogrid. Tracked construction <br /> equipment should not be allowed to operate directly on the geogrid. A 6" minimum <br /> thickness of backfill is required prior to operation of tracked vehicles over the geogrid. <br /> Rubber-tired equipment may pass over the geogrid reinforcement at slow speeds less than <br /> 6 mph. Sudden breaking and sharp turning should be avoided. Although the PVC <br /> coating should protect the geogrid from UV exposure indefinitely,Huesker recommends <br /> that the soil cover should be placed over the geogrid within 14 days as an extra <br /> precaution. Only hand-operated compaction equipment should be allowed within 3 feet <br /> of wall face. <br /> Drainage placement shall be placed in accordance with the construction plans or as <br /> modified by the wall design engineer. This may consist of a drainage collector pipe in <br /> combination with a drainage net in order to maintain gravity flow to the outside of the <br /> reinforced soil zone. <br /> r <br /> 11107A South Commerce Blvd.•P.O.Box 411529•Charlotte,NC 28241 •Telephone(704)588-5500/(800)942-9418•Fax(704)588-5988 <br />
The URL can be used to link to this page
Your browser does not support the video tag.