My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998 - GME consult. inc - recom. for retaining wall
Orono
>
Property Files
>
Street Address
>
W
>
West Farm Road
>
1770 West Farm Road - 27-118-23-44-0017
>
Correspondence
>
1998 - GME consult. inc - recom. for retaining wall
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:23:24 PM
Creation date
1/27/2020 8:59:53 AM
Metadata
Fields
Template:
x Address Old
House Number
1770
Street Name
West Farm
Street Type
Road
Address
1770 West Farm Road
Document Type
Correspondence
PIN
2711823440017
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMBER OF <br /> HUESKER I11Ci GIC <br /> RESEARCH <br /> INSTITUTE <br /> FORTRAC GEOGRIDS <br /> INSTALLATION GUIDE FOR RETAINING WALLS <br /> Fortrac geogrids are comprised of high tenacity polyester yarns, woven into an <br /> interlocking pattern and then coated with polyvinyl chloride. They are very pliable for <br /> Inst 1lation and they are resistant to freeze-thaw conditions, soil chemicals and ultra- <br /> violet exposure. <br /> The primary reinforcing direction for all Fortrac geogrids is in the long direction of the <br /> roll (also called the machine direction). <br /> Fortrac geogrids are shipped to the jobsite in rolls; they are encased in a plastic wrap. <br /> Leave the wrap on the rolls until ready for use. This will protect the grid from <br /> unnecessary exposure and damage. <br /> Site Preparation: <br /> The contractor should excavate to the lines and grades shown on the project grading <br /> plans. The contractor should take precautions to minimize over-excavation. <br /> Foundation Soil Preparation for Reinforced Soil Zone <br /> The foundation soil shall be excavated as required for footing dimensions and limits of <br /> reinforced soil zone as shown on the construction drawings or as directed by the wall <br /> design engineer. The foundation soil should be tested by the owner to assure that the <br /> actual foundation soil strength meets or exceeds the assumed design bearing strength. <br /> Soils not meeting the required strength should be removed and replaced with soil <br /> meeting the design criteria. <br /> A compacted drainage aggregate should be placed as shown on the construction <br /> drawings. The drainage aggregate base should be compacted to provide a level hard <br /> surface on which to place the first course of modular block units. <br /> Geogrid Placement <br /> The Fortrac geogrid should be installed at the proper elevation and orientation as shown <br /> • <br /> in the wall details on the project construction plans or as directed by the wall design <br /> Engineer. Cut the geogrid to the specified length as shown in the engineers drawings. <br /> The primary reinforcing direction should be placed perpendicular to the wall face and <br /> should be one continuous piece of material. <br /> End pieces of geogrid too short to cover the full expanse of the reinforced section should <br /> be discarded or held for use on shorter sections. Adjacent sections of geogrid should be <br /> butted in a manner to assure 100% coverage after placement. <br /> 11107A South Commerce Blvd.•P.O.Box 411529.Charlotte,NC 28241 •Telephone(704)588-5500/(800)942-9418•Fax(704)588-5988 <br />
The URL can be used to link to this page
Your browser does not support the video tag.