My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997 - Septic system
Orono
>
Property Files
>
Street Address
>
W
>
West Branch Road
>
4520 West Branch Rd - 06-117-23-34-0004
>
Septic
>
1997 - Septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:27:17 PM
Creation date
1/24/2020 10:23:47 AM
Metadata
Fields
Template:
x Address Old
House Number
4520
Street Name
West Branch
Street Type
Road
Address
4520 West Branch Rd
Document Type
Septic
PIN
0611723340004
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUMP SELECTION PROCEDURE <br /> A. Determine pump capacity: <br /> Gravity Distribution <br /> 1. Minimum suggested is 20 gpm <br /> 2. Maximum suggested is 45 gpm <br /> Pressure Distibution <br /> 3.a. Select number of perforated laterals 2 Perforation Discharges in GPM <br /> b. Select perforation spacing= 3 feet. <br /> c. Subtract 2 ft. from the rock layer length. Head Perforation diameter <br /> y g (feet) (inches) <br /> -3 $' -2 ft. = 3 4- feet. 7/32 1/4 <br /> Rock lays ength <br /> d. Determine the number of spaces betweenperforations. <br /> l.oa 0.56 0. 4 <br /> Length perf. spacing=SC ft.+ 3 ft. = 1 spaces 1s 0.80 0.04 <br /> e. IP. spaces + 1 =. f perforations/lateral 2.ob o.80 1.04 <br /> f. Multiply perforations per lateral by number f laterals to a Use 1.0 foot single homes. <br /> et total number of perforations. x _ perforations. <br /> b Use 2.0 feet for anything else. <br /> 7 laterals per/s/ateral <br /> g. G x .._ Cgpm. <br /> SELEt_1'ED PUMP CAPACITY •ZO gpm <br /> B.Determine head requirements: <br /> Soil treatment system <br /> 1. Elevation difference between pump and point of discharge. . . <br /> 4 feet Total pipe length <br /> 2. If pumping to a pressure distribution system,five feet for pressure <br /> required at manifold if gravitysystem,zero. <br /> �j" Wet iii'feet Elevation Difference <br /> pipe3. Friction loss <br /> a. Enter friction loss table with gpm and pipe diameter.Read friction loss in feet per 100 feet from table(F-14). <br /> F.L. = e 73 ft./100 ft of pipe <br /> b. Determine total pipe length from pump to discharge Friction Loss in Plastic Pipe <br /> point. Estimate by adding 25 percent to pipe length for fitting Nominal <br /> loss,or use a fitting loss chart(F-15 R0 feet). pipe dia. <br /> Equivalent pipe length- 1.25 times pipe length= Flow Rate <br /> Z 0 x 1.25 = 2 S feet gpm 1.5" 2" 3" <br /> c. Calculate total friction loss by multiplying <br /> friction loss in ft/100 ft li)y equivalent ipe length. 20 2.47 0.73 0.11 <br /> Total friction loss = . 7 3 x X +100 = I feet 25 3.73 1.11 0.16 <br /> 4. Total head required is the sum of elevation difference, 30 5.23 1.55 0.23 <br /> 35 6.96 2.06 0.30 <br /> special head requirements,and total friction loss. 40 8.91 2.64 0.39 <br /> q 45 11.07 3.28 0.48 <br /> t + lc + 1 50 13.46 3.99 0.58 <br /> (1) (2) (3c) 55 4.76 0.70 <br /> 60 5.60 0.82 <br /> r 65 6.48 0.95 <br /> TOTAL HEAD /-) feet 70 7.44 1.09 <br /> C. Pump selection <br /> 1. A pump must be selected to deliver at least <br /> 0 gpm (Step A) with at least /S. feet of total head (Step B). <br />
The URL can be used to link to this page
Your browser does not support the video tag.