My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997 - Septic system
Orono
>
Property Files
>
Street Address
>
W
>
West Branch Road
>
4520 West Branch Rd - 06-117-23-34-0004
>
Septic
>
1997 - Septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:27:17 PM
Creation date
1/24/2020 10:23:47 AM
Metadata
Fields
Template:
x Address Old
House Number
4520
Street Name
West Branch
Street Type
Road
Address
4520 West Branch Rd
Document Type
Septic
PIN
0611723340004
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PRESSURE DISTRIBUTION SYSTEM END PERFORATION OF A PERFORATED LATERAL <br /> _-Glair Cover <br /> 1. Select number of perforated laterals %,:� <br /> ,O�• Topsoil ,)�j <br /> ' Layer of Geourttll. Fabric for los <br /> 2. Select perforation spacing = 3 feet. •• Loamy Sand Layer ' Inch layer of hay or straw covered <br /> with red !dein paper) <br /> 166 •liC7111rrnliondis Perforahon Drtll.d Horuonialin <br /> 3. Since perforations should not be placed closer than 1 ft. to ph. .1------,--..� Al Least p12•to Ea,e <br /> the edge of the rock layer (see diagram), subtract 2 ft. from !rain Field Rock .. of Rock Layer <br /> i‘ Perforations Located al <br /> the rock layer length. Clean Sand Layer Bottom of Lateral <br /> — 2 ft. = Y feet. ,Original Sall Properly Scarified <br /> Rock layer length Before Placing Sand Layer <br /> Requued Perforation Discharge <br /> 4. Determine the number of spaces between perforations. in gallons per cornute lgpml <br /> Divide the length above by perforation spacing and round °`H ad` %sl '"M ;.a". <br /> (feet) <br /> down to nearest whole number. <br /> 1.0a 0.56 (57.-74) <br /> Length perf. spacing = -34' ft. _ 3 ft. = / spaces <br /> 2.0b 0.80 1.04 <br /> (3) (2) a.Use for single family homes <br /> b.Use for all other applications <br /> 5. Number of perforations is equal to one plus the number of <br /> perforation spaces . <br /> / spaces + 1 = / p Maximum number of quarter inch perforations per <br /> erforations/lateral lateral to guamantee< 10%discharge variation <br /> Perforation <br /> 6. Multiply perforations per lateral by number of laterals to Spacing <br /> jg 1% ly 2 <br /> get total number of perforations. 2.5 14 18 28 <br /> _a_ /3 = �i C�perforations. 3.0 13 17 26 <br /> laterals X pens/lateral3.3 12 16 25 <br /> 7. Determine required flow rate by multiplying 4.0 11 15 23 <br /> number of perforations by flow per perforation 5.0 10 14 22 <br /> e <br /> 71/ <br /> pens X gpm/pert =.3_0_ <br /> = iNIFOI.D LOCATED AT ENO OF PRQSr.ME DISTRIeu1 SYSTru <br /> Y gpm. Y <br /> 8. If laterals are connected to header pipe as shown on upper , <br /> example, to select minimum required lateral diameter; enter , - l I <br /> table with perforation spacing and number of perforations — s,,,�" `- <br /> per lateral. Select minimum diameter for \^ `"` <br /> perforated lateral = I % / <br /> inches. <br /> tlYWr of eeeeonorco.see LATERALS mit <br /> M(]3.ME Clfre..ur KM re..dro <br /> 0-......r.......a of <br /> 9. If perforated lateral system is attached to manifold pipe near , r`r .r" • . s <br /> Y 1 <br /> the center, lower diagram, perforated lateral length and --- 'r.anpE„..MOO a <br /> Inumber of perforations per lateral will be approximately one <br /> half of that in step 8. Using these values, select minimum <br /> diameter for perforated lateral = inches. \.� ,,. '`„ � ;� <br /> e- - <br /> O, <br /> / <br /> J <br /> \ <br />
The URL can be used to link to this page
Your browser does not support the video tag.