My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-21-2020 Planning Commission Packet
Orono
>
Planning Commission
>
2020
>
01-21-2020 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2020 3:59:09 PM
Creation date
1/22/2020 9:41:44 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
880 (c) Interim use permits shall be reviewed as a minimum at least annually by the city council. <br /> 881 (d) An interim use permit expires one year after approval if the proposed use has not been commenced <br /> 882 or a building permit for a structure to support the interim use has not been issued. <br /> 883 (e) An interim use permit expires if the interim use ceases operation for a continuous period of at least <br /> 884 one year. <br /> 885 (Ord.No. 194 3rd series,§1,5-8-2017) <br /> 886 Sec.78-1749.-Termination. <br /> 887 An interim use permit expires and the interim use shall terminate upon the occurrence of any of the <br /> 888 following events: <br /> 889 (a) The termination date specified in the interim use permit. <br /> 890 (b) Upon violation of conditions under which the permit was issued. <br /> 891 (c) Upon change in the city's zoning regulations which renders the use nonconforming. <br /> 892 (d) The redevelopment of the use and property upon which it is located to a permitted or conditional <br /> 893 use as allowed within the respective zoning district. <br /> 894 (Ord.No. 194 3rd series,§ 1,5-8-2017) <br /> Page 125 <br />
The URL can be used to link to this page
Your browser does not support the video tag.