Laserfiche WebLink
Bonestroo <br /> November 13, 2009 <br /> Gordon James Contruction <br /> 5600 Pioneer Creek Drive#1B <br /> Maple Plain MN 55359-5042 <br /> RE: Permit 2009-00351 -70 Wear Lane South <br /> The active summer construction season is fast drawing to a close here in the state of winter and frozen <br /> ground. As we move into a new season it is important we take the proper precautions on our active sites <br /> to help eliminate any erosion problems or added expenses that may be incurred due to winter freeze thaw <br /> events and the inevitable spring runoff. As construction continues throughout the winter in the City of <br /> Orono it is important to minimize the amount of open soil by providing temporary or permanent cover, <br /> one of the key elements in preventing soil loss. It is also required that the appropriate BMPs be <br /> maintained on-site by December 1, 2009 as follows: <br /> • Exposed soil areas must be stabilized with the appropriate seed mix and erosion control <br /> blanket, disc anchored mulch applied at a rate of 2 tons per acre or other effective means to <br /> control erosion. <br /> o Areas requiring stabilization will include but are not limited to small miscellaneous <br /> areas, landscaping areas, sidewalk backfill,non-active stockpiles, finished grading <br /> areas, etc. <br /> o Areas being worked after November 26th must be stabilized weekly until <br /> construction ends. <br /> o In the event that it snows and there are frozen ground conditions,mulch can be <br /> applied effectively over the snow. <br /> • Seeding must be completed with the appropriate seed mix as indicated below. Dormant <br /> seeding shall be done in the later fall after the soil temperature is consistently below 50 <br /> degrees Fahrenheit. Seeding done before or after the indicated seed dates may require <br /> reseeding if the seed does not take. In the event that it snows and there are frozen ground <br /> conditions, seed can be applied effectively over the snow. <br /> Fall and Dormant Seeding Dates <br /> Seed Mixture Number Fall Dormant Seeding <br /> 100 Aug. 1 —Oct. 1 Oct. 20—Dec. 1 <br /> 150, 190 July 20—Oct. Oct. 20 -Dec. 1 <br /> 20 <br /> 240,250,260,270 July 20— Sept. Oct. 20—Dec. 1 <br /> 20 <br /> 310, 325,328, 330, Sept. 20—Oct. Oct. 20—Dec. 1 <br /> 340,350 20 <br /> • Rock construction entrances to access the construction site and prevent tracking sediment <br /> off site <br /> • Silt fence or an approved perimeter control device shall be installed to control runoff <br /> • Soil stockpiles should be eliminated or consolidated to the extent as possible and be <br /> protected with perimeter control and mulch applied on all stockpiles that will remain dormant <br /> for the winter months. <br /> • Storm Sewer inlet protection including curb and gutter catch basins,parking lot/road drains, <br /> and backyard drop inlets must be: <br />