My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-25-2008 Council Work Session Minutes
Orono
>
City Council
>
Minutes
>
Historical
>
1974-2024 Minutes - work sessions
>
2008
>
11-25-2008 Council Work Session Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 2:03:21 PM
Creation date
1/15/2020 2:03:20 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
iv) Check with Minnetonka Beach to see if they are making any progress in their efforts <br /> to underground utilities. <br /> v) Council determined that a neighborhood meeting should be scheduled on December <br /> lOt" at the Freshwater Center. Tom Kellogg and Soren will work on a letter with <br /> details about undergrounding utilities. Xcel representatives will be invited to attend <br /> to respond to resident questions. <br /> 4. Engineer's Report <br /> a. Contract Services and Rate <br /> i) Rates are proposed to increase by an average of 2.5%with no service changes. For <br /> 2008 there is an additional retainer rate that allowed for office hours. Tom and Bill <br /> will work together to develop a plan for something in addition to standard rates for <br /> 2009. <br /> ii) Council commented that working with the engineer during the City Administrator <br /> transition has worked well. City staff and Council have a strong working relationship <br /> with Tom Kellogg. <br /> iii) As with the City Attorney, the City has the option to cut back on use of the <br /> engineering services to address recession factors. <br /> b. Casco Point Draft Feasibility Report <br /> i) Brief discussion was held regarding the Feasibility Report. Council will review more <br /> closely and direct comments to Lin, lvee a,ci.orono.mn.us, to compile in the next <br /> week to 10 days. <br /> ii) The report can be brought to the next Council meeting for adoption with discussion <br /> about specific topics at the next work session. <br /> iii) The costs for street replacement in the feasibility report are similar to the original <br /> costs from Pavement Management Plan and are very close to the bond documents. <br /> As the street project was discussed, it made sense to look at replacing existing utilities <br /> under the street at same time. These costs were included in the report and increases <br /> the total costs. Currently there are not enough funds in sewer, water and stormwater <br /> funds to adequately cover the entire cost of sewer, water and stormwater <br /> improvements. <br /> iv) Replacement of sewer and water lines that are under the road and directly related to <br /> the street project could be included with work done as part of the bond funds. Sewer <br /> and water funds could then pay back costs to the debt service fund. <br /> v) Stormwater costs address issues of 35 —36 properties with problems. The stormwater <br /> fund would be depleted if all issues were addressed. Many of the stormwater issues <br /> could be scheduled for improvement at a later date. <br /> vi) Finance will work on options and a recommendation for financing additional costs for <br /> sewer, water and stormwater improvements. <br /> vii)The mill and overlay and street seal coat projects for 2008 costs were less than <br /> budgeted. An adjustment will be made to the Pavement Management Plan. <br /> 5. TNT Preparation by Finance <br /> a. Presentation for the Truth in Taxation Hearing includes the following main points: <br /> i) General fund increase of 2.95% <br /> ii) Flat revenues <br /> iii) Positions not filled— 3 <br /> iv) One of the lowest tax rates in the State <br /> *Indicates Staff Action Item Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.