My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-16-2018 Planning Commission Packet
Orono
>
Planning Commission
>
2018
>
04-16-2018 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 3:54:11 PM
Creation date
1/14/2020 3:27:06 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FILE #LA18-000034 <br />16 April 18 <br />Page 2 of 3 <br />Plan Review Comments <br />Number & Type of Units: Parking: The two story building reflects 70 units: 22 memory care; 24 <br />assisted living; and 24 independent living units. This is consistent with the number of units <br />approved within the concept plan review. Per Met Council, all units count toward the city's <br />density calculation. <br />Site Plan: The final site plan is consistent with the approved preliminary plans with the addition <br />of the modifications directed by Resolution No. 6786. There are outstanding comments from the <br />City's engineer which should be addressed by the developer prior to the City Council review. <br />Parking: The plan reflects 85 total parking stalls: 46 surface spaces; and 39 located in the <br />underground garage. This is consistent with the number approved within the concept plan review. <br />Architecture: The Stonebay development has established a certain design characteristic. During <br />the concept review Staff recommended that the building materials be consistent with the pattern <br />established by the Stonebay development, and include architectural shingles, cement/ fiber board <br />siding, brick and/ or stone. The materials appear to be consistent with the Stonebay development <br />and are detailed in the final master plan (Exhibit F7 -sheet A 5.0). <br />Final Plat. Final Plat is necessary to re -plat, not subdivide, Outlot D to a buildable lot. <br />Platting Fees: Below is a summary of the fees, collectible in full at the time of approval of the final <br />plat. These fees have been recalculated to reflect the current (2018) Fee Schedule. <br />Park Dedication Fee: <br />$3,250/unit x 70 (# of units) _ $227,500.00 <br />Stormwater & Drainage <br />Trunk Fee: <br />Residential > 4 units/acre: $8,490/ac x 3.5 acres = $29,715.00 <br />TOTAL: <br />$257,215.00 <br />uue at ine time or permit: <br />Met Council SAC Fee: TBD by the Metropolitan Council <br />Sewer Connection Charge: $5,100 x # of SAC units = $ TBD* <br />Water Connection Charge: $4,240 x # of SAC units = $ TBD* <br />*Sewer & Water connection charges will be due with the SAC fee at the time of the building <br />permit. <br />Engineer Comments <br />The City's consulting engineer has provided a detailed review and comments on the plans. Those <br />comments are attached as Exhibit H. The developer should address all applicable comments prior <br />to placement on the City Council's agenda for final action. <br />Public Comments <br />To date, no additional public comments have been received. <br />Issues for Consideration <br />1. Does the Planning Commission find that that the proposed building and site layout are <br />consistent with approved concept plan? <br />2. Are there any other issues or concerns with this application? <br />
The URL can be used to link to this page
Your browser does not support the video tag.