Laserfiche WebLink
C)2018 Westwood Professional Services, Inc. <br />SAN <br />-1020.46 RIM <br />�i 1014.13 INV NE <br />1016.61 INV W <br />i 1013.91 INV S <br />X ;PST ---- <br />70.-- <br />{ STO <br />24 /NCH- I 1-1021.13 RIM <br />o 1009.83 /N V. E -W 8 /NCh <br />- SANSAN SM <br />WA WA AT- <br />I <br />1020.56 RIM --- <br />1013.69 /NV N <br />1012.91 INV E <br />CBMH 206 <br />RE=1025.50 <br />IE=1021.50 <br />49 LF 12" I <br />RCP 0 0.88% <br />1024. <br />1012.43 INV E \` <br />101s2.14/NVW <br />G. POH - <br />POH <br />Utility Legend <br />EXISTING PROPOSED <br />PROPERTY LINE <br />/ - - - - - - - - EASEMENT LINE <br />/ CURB AND GUTTER <br />SAN SANITARY SEWER <br />STO F= ►► ■ STORM SEWER <br />WA T- I WATER MAIN <br />VQ WA I-..} HYDRANT <br />>< GATE VALVE <br />_ FLARED END SECTION <br />CONNECT TO EXISTING 6 PVC SANITARY (WITH RIPRAP) <br />CONNECT TO EXISTING r-1023.74 RIM STUB AND EXTEND 33 LF. FIELD VFRIFY <br />WM STUB WITH HYDRANT i 1012.74 /NV. E-ry 0 I N AND INVERT ELEVATION. <br />AND 6" GATE VALVE cd^ K'tLEP 'PARKWA Y <br />N H - SAN �a A= -1022.92 RIM \ <br />W WAr war- 4ZlOR-TO-STORM SEWER _C� STRUCTION V y- N r 1014.89 /NV. W -SE \ <br />CLEARANCE AT UTILITY�ROSSING WITH --Fid �-1021.58 RIM \ <br />VERIFIED SANITARY STUB IN RT. NOTIFY ENGINEER WA CONNECfi TO EXLS151a.02 /NV N \ <br />sro sro 30 /N��' IF ADJUSTMEN H T CBMH 104 \ <br />I F <br />CBMH 106 <br />RE=1023.90 <br />IE=1020.40 <br />Westwood <br />C71 <br />STMH 205 <br />RE=1026.30 <br />I E=1021.07 <br />Phone (952) 937-5150 7699 Anagram Drive <br />Fax (952) 937-5822 Eden Prairie, MN 55344 <br />Toll Free (888) 937-5150 westwoodps.com <br />Westwood Professional Services, Inc. <br />ro r <br />7( crn � � AND 6" GA VALVE RE=1023.00 \ <br />17U --sro D - "N)=1017.50 \ <br />57 LF 12" - - s ` 1-(S)=10i 4.27 \ <br />_ - - - - - RCP 0 0.58% ! ar IE(E)= i 4.10 \ <br />ZBWH_1b5 ► % \ ro qr \ <br />RE=1024.00 �► - \ <br />257 LF 12 RCP 0 1.00% ►► \ \ <br />IE=1020.07 _ <br />�j wSg CF�' sr wq \ <br />AREA DRAIN 302 AREA DRAIN 301 <br />RE=1027.50 RE=1027.50 <br />IE=1020.90 IE=1020.70 <br />STMH 204 <br />RE=1026.90 <br />I E(E, W)=1020.79 <br />IE(S)=1021.50 <br />LF 12'" ;JP <br />8 LF 12" RCP <br />02.00% <br />8" PVC WM <br />STUB <br />PROPOSED BUILDING <br />SANITARY STUB-/ <br />IE=1019.00 <br />COORDINATE GARAGE DRAIN <br />SUMP WITH MECHANICAL <br />VERIFY SERVICE SIZE WITH <br />PLUMBING DESIGN PER <br />STATE PLUMBING CODE <br />HYDRANT WITH <br />6" GATE VALVE <br />STMH 202 <br />Footprint = 39,1976 s.f. <br />SCHEDULE <br />FFE=1028.p <br />IE E,W,N =1020.40 <br />( ) <br />GARAGE=1017.0 <br />3" <br />PVC <br />RE=1026.60 <br />0.50% <br />101 <br />59 LF 10" <br />SCH-40 0 0.50% - - <br />IES =1021.35 <br />STMH 203 <br />RE=1026.90 <br />SANITARY STUB-/ <br />IE=1019.00 <br />COORDINATE GARAGE DRAIN <br />SUMP WITH MECHANICAL <br />VERIFY SERVICE SIZE WITH <br />PLUMBING DESIGN PER <br />STATE PLUMBING CODE <br />HYDRANT WITH <br />6" GATE VALVE <br />STMH 202 <br />011.47 <br />X44 LF 12" \ <br />RCP 0 0.30% <br />20 LF 0 1.00% <br />TRENCH DRAIN <br />RE=1016.90 <br />IE(S)=1014.60 <br />IE(N)=1014.40, <br />STMH 201 <br />RE=1026.70 <br />IE(W)=1019.25 <br />IE(SE)=1019.2; <br />IE(S)=101020.6-5 <br />11- <br />48 LF 127�" <br />RCP 0 1.00% <br />\-1021.95 RIM CBMH 210 <br />025 90 <br />1009.65 /NV E -W IE=1021.13 <br />WAYZATA BOULEVARD WEST (HENNEP/N COUNTY STATE AID HIGHWAY 112) <br />I hereby certify that this plan was prepared by me or under my Revisionm <br />direct supervision and that I am a duly licensed PROFESSIONAL <br />ENGINEER under ffie laws of the State of Minnesota 08/07/17 - City Comments <br />03/20/18 - Final Development Approval Plans <br />%R11L <br />Ryan K Bluhm <br />�� 03/20/18 ><.iaene Na 41257 <br />Checked: RMB <br />Drawn: SYE <br />Record Drawing by/date: <br />CBMH 1030 <br />Rr= =l 022.00 <br />=1013,52 <br />O <br />OT <br />1 <br />I� <br />� 13 <br />� II <br />CBMH 102J <br />RE=1024.00 <br />IE(NW)=1012.25 <br />IE(E)=1012.05 <br />LF -8" _Pt <br />I <br />I <br />II <br />�I <br />I <br />I <br />I <br />I <br />3 <br />I I <br />I <br />�I <br />I <br />j___L <br />I� <br />I <br />I <br />11020.16 RIM <br />I 11909.03 /NV W -SE <br />1 � <br />1 <br />*1 \ <br />0 <br />`1009.24 /NV <br />30 /NCH <br />I <br />-FES 101 <br />IE=1011.70 I <br />35 LF 18" <br />RCP 01.00% <br />-8" GATE VALVE <br />-CONNECT TO <br />EXISTING 12" <br />PVC WM WITH <br />12"x8" TEE <br />i <br />1009.01 INV <br />30 INCH <br />-APPROXIMATE <br />LOCATION OF EXIST. <br />12" HDPE SDR11 WM. <br />FIELD VERIFY <br />LOCATION AND <br />ELEVATION OF WM. <br />70J <br />Prepared for: <br />Apex HLLC <br />2110 Lyndale Avenue South Suite C <br />Minneapolis, MN 55405 <br />Call 48 Hours before digging: <br />811 or ca11811.com <br />General Utility Notes Common Ground Alliance <br />1. THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION <br />OF EXISTING UTILITIES AS SHOWN ON THESE PLANS ARE BASED ON RECORDS OF THE <br />VARIOUS UTILITY COMPANIES AND LIMITED MEASUREMENTS TAKEN IN THE FIELD. THE <br />INFORMATION SHALL NOT BE RELIED ON AS BEING EXACT OR COMPLETE. THE CONTRACTOR <br />SHALL VERIFY EXISTING CONDITIONS PRIOR TO CONSTRUCTION AND NOTIFY THE OWNER OR <br />ENGINEER OF DISCREPANCIES. <br />2. ALL SANITARY SEWER, STORM SEWER AND WATER MAIN INSTALLATIONS SHALL BE PER <br />MINNESOTA PLUMBING CODE AND IN ACCORDANCE WITH THE CURRENT EDITION OF <br />"STANDARD SPECIFICATIONS FOR WATER MAIN AND SERVICE LINE INSTALLATION AND <br />SANITARY SEWER AND STORM SEWER INSTALLATION" AS PREPARED BY THE CITY <br />ENGINEERS ASSOCIATION OF MINNESOTA. <br />3. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL OBTAIN THE NECESSARY FEDERAL, <br />STATE AND LOCAL PERMITS FOR THE PROPOSED WORK OR VERIFY WITH THE OWNER OR <br />ENGINEER THAT PERMITS HAVE BEEN OBTAINED. PERMIT FEES SHALL BE THE <br />RESPONSIBILITY OF THE CONTRACTOR UNLESS OTHERWISE ARRANGED WITH THE OWNER. <br />4. CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATION AND <br />DIMENSIONS OF DOORWAYS, RAMPS, TRUCK DOCKS, PRECISE BUILDING DIMENSIONS AND <br />EXACT BUILDING UTILITY CONNECTION LOCATIONS. <br />5. ALL PRIVATE UTILITIES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE SPECIFICATIONS <br />OF THE APPROPRIATE UTILITY COMPANY. THE CONTRACTOR SHALL COORDINATE THE <br />SERVICE LINE CONSTRUCTION WITH THE UTILITY COMPANIES. <br />6. CONTRACTOR SHALL OBTAIN ALL NECESSARY CITY PERMITS FOR UTILITY CONNECTIONS, <br />AND UTILITIES SHALL BE INSPECTED AND APPROVED BY THE CITY. THE CITY SHALL BE <br />NOTIFIED 48 -HOURS PRIOR TO COMMENCING WITH THE UTILITY CONSTRUCTION OR ANY <br />REQUIRED TESTING. CONTRACTOR SHALL NOT OPERATE, INTERFERE WITH, CONNECT ANY <br />PIPE OR HOSE TO, OR TAP ANY WATER MAIN BELONGING TO THE CITY UNLESS DULY <br />AUTHORIZED TO DO SO BY THE CITY. ANY ADVERSE CONSEQUENCES OF SCHEDULED OR <br />UNSCHEDULED DISRUPTIONS OF SERVICE TO THE PUBLIC ARE TO BE THE RESPONSIBILITY <br />OF THE CONTRACTOR. <br />7. WATER MAIN LENGTHS AS SHOWN ARE APPROXIMATE HORIZONTAL LENGTHS. ALLOW FOR <br />ADDITIONAL PIPE WHEN INSTALLING ON SLOPES OR WHEN DEFLECTIONS ARE REQUIRED. <br />THE JOINT DEFLECTIONS SHALL NOT EXCEED THE MAXIMUM RECOMMENDED BY THE PIPE <br />MANUFACTURER OR BY LOCAL GOVERNING SPECIFICATIONS. FITTINGS REQUIRED TO <br />CONSTRUCT WATER MAIN SHALL BE INCLUDED IN WATER MAIN CONSTRUCTION. <br />8. PROVIDE WATER MAIN THRUST RESTRAINTS PER CITY STANDARD REQUIREMENTS. <br />9. A MINIMUM VERTICAL SEPARATION OF 18 INCHES IS REQUIRED AT ALL WATER MAIN <br />CROSSINGS WITH SANITARY SEWER OR STORM SEWER. <br />10. UTILITY SERVICES TYPICALLY TERMINATE 5' OUTSIDE BUILDING WALL UNLESS OTHERWISE <br />SHOWN OR NOTED. <br />11. ALL MATERIALS SHALL COMPLY WITH THE REQUIREMENTS OF THE CITY. <br />12. ALL WATER LINES SHALL BE DUCTILE IRON WRAPPED IN POLYETHYLENE, CLASS 52 WITH <br />7.5' MINIMUM COVER. PROVIDE MINIMUM SEPARATION OF 18" FROM SANITARY SEWER & <br />STORM SEWER. INSULATE WATER MAIN IF LESS THAN 7.5' OF COVER. <br />13. INSULATION SHALL BE DOW STYROFOAM HI BRAND 35 OR EQUIVALENT, WITH 4 INCHES OF <br />THICKNESS. <br />14. SANITARY SEWER PIPE OUTSIDE THE BUILDING ENVELOPE SHALL BE POLYVINYL CHLORIDE <br />(PVC) SDR 35 OR 26. SDR 26 IS REQUIRED FOR DEPTHS GREATER THAN 15 FEET. <br />SANITARY SEWER PIPE WITHIN 5 FEET OF BUILDING AND UNDER FOOTINGS, PIPE SHALL BE <br />PVC SCHEDULE 40. <br />15. STORM SEWER PIPE SHALL BE REINFORCED CONCRETE PIPE (CLASS 5 FOR PIPE <br />DIAMETERS 18" AND SMALLER, CLASS 3 FOR PIPE DIAMETERS 21" AND LARGER UNLESS <br />OTHERWISE NOTED) WITH R-4 GASKETS, OR HDPE STORM SEWER PIPE IF ALLOWED BY THE <br />CITY. HDPE STORM PIPE SHALL MEET REQUIREMENTS OF ASTM F2648. PIPE SHALL BE <br />WATER TIGHT ACCORDING TO ASTM D3212 REQUIREMENTS. SEE PLAN FOR LOCATIONS <br />WHERE RCP IS REQUIRED. PVC STORM SEWER PIPE SHALL BE SCHEDULE 40 PIPE. FLARED <br />END SECTIONS SHALL BE RCP WITH TRASH GUARDS & RIP -RAP. <br />STORM <br />SEWER CASTING <br />SCHEDULE <br />STRUCTURE <br />NUMBER TYPE <br />IE E,W,N =1020.40 <br />( ) <br />CASTING TYPE <br />6 LF -6 <br />PVC <br />RE=1026.60 <br />101 <br />FES <br />IES =1021.35 <br />102 <br />IE(W,S)=1019.92 <br />48" <br />R-3067 <br />103 <br />CBMH <br />48" <br />R-3067 <br />104 <br />CBMH <br />48" <br />R-3067 <br />105 <br />IE(E)=1019.92 <br />6 LF -8" PVC�L�-�-['-' <br />R-3067 <br />106 <br />2011 LF7 -8" PVC 1 <br />I <br />2'x3' <br />j�LF 12" <br />RCP 0 0.��% <br />- - - - ►►97 LF 12" RCP ®►�50% - - <br />►► 94 LF 15" RCP f►0.50% <br />R -1642B <br />202 <br />12 LF 12"� <br />--- ---- <br />R -1642B <br />203 <br />RCP ®1.00% <br />aT <br />-30 /NCH 14 LF 15" <br />-sro <br />s,o <br />CBMH 209 <br />CBMH 208 <br />8 LF 12" RCP To - c n <br />crn 5T( RCP ®0.35% <br />RE=1026.60 <br />IE=1021.66 <br />RE=1026.60 <br />01.00% <br />CBMH 207 <br />CBMH <br />IE=1021.43 <br />R-3067 <br />RE=1026.10 <br />x <br />x x <br />x x_ <br />IE=1020.04 <br />CBMH <br />- GAS <br />R-3067 <br />209 <br />CBMH <br />Gr, �e <br />PON rG: -POhI <br />OH „ <br />POH <br />CBMH <br />2'x3' <br />R-3067 <br />RAISE STMH RIM AND ADJUST <br />AREA DRAIN <br />12" <br />NYLOPLAST <br />CASTING AS NEEDED TO <br />AREA DRAIN <br />12" <br />NYLOPLAST <br />AVOID PROPOSED CURB <br />RE=1026.34 <br />IE(N)=1020.60 <br />IE(E,W)= I009� .65 <br />011.47 <br />X44 LF 12" \ <br />RCP 0 0.30% <br />20 LF 0 1.00% <br />TRENCH DRAIN <br />RE=1016.90 <br />IE(S)=1014.60 <br />IE(N)=1014.40, <br />STMH 201 <br />RE=1026.70 <br />IE(W)=1019.25 <br />IE(SE)=1019.2; <br />IE(S)=101020.6-5 <br />11- <br />48 LF 127�" <br />RCP 0 1.00% <br />\-1021.95 RIM CBMH 210 <br />025 90 <br />1009.65 /NV E -W IE=1021.13 <br />WAYZATA BOULEVARD WEST (HENNEP/N COUNTY STATE AID HIGHWAY 112) <br />I hereby certify that this plan was prepared by me or under my Revisionm <br />direct supervision and that I am a duly licensed PROFESSIONAL <br />ENGINEER under ffie laws of the State of Minnesota 08/07/17 - City Comments <br />03/20/18 - Final Development Approval Plans <br />%R11L <br />Ryan K Bluhm <br />�� 03/20/18 ><.iaene Na 41257 <br />Checked: RMB <br />Drawn: SYE <br />Record Drawing by/date: <br />CBMH 1030 <br />Rr= =l 022.00 <br />=1013,52 <br />O <br />OT <br />1 <br />I� <br />� 13 <br />� II <br />CBMH 102J <br />RE=1024.00 <br />IE(NW)=1012.25 <br />IE(E)=1012.05 <br />LF -8" _Pt <br />I <br />I <br />II <br />�I <br />I <br />I <br />I <br />I <br />3 <br />I I <br />I <br />�I <br />I <br />j___L <br />I� <br />I <br />I <br />11020.16 RIM <br />I 11909.03 /NV W -SE <br />1 � <br />1 <br />*1 \ <br />0 <br />`1009.24 /NV <br />30 /NCH <br />I <br />-FES 101 <br />IE=1011.70 I <br />35 LF 18" <br />RCP 01.00% <br />-8" GATE VALVE <br />-CONNECT TO <br />EXISTING 12" <br />PVC WM WITH <br />12"x8" TEE <br />i <br />1009.01 INV <br />30 INCH <br />-APPROXIMATE <br />LOCATION OF EXIST. <br />12" HDPE SDR11 WM. <br />FIELD VERIFY <br />LOCATION AND <br />ELEVATION OF WM. <br />70J <br />Prepared for: <br />Apex HLLC <br />2110 Lyndale Avenue South Suite C <br />Minneapolis, MN 55405 <br />Call 48 Hours before digging: <br />811 or ca11811.com <br />General Utility Notes Common Ground Alliance <br />1. THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION <br />OF EXISTING UTILITIES AS SHOWN ON THESE PLANS ARE BASED ON RECORDS OF THE <br />VARIOUS UTILITY COMPANIES AND LIMITED MEASUREMENTS TAKEN IN THE FIELD. THE <br />INFORMATION SHALL NOT BE RELIED ON AS BEING EXACT OR COMPLETE. THE CONTRACTOR <br />SHALL VERIFY EXISTING CONDITIONS PRIOR TO CONSTRUCTION AND NOTIFY THE OWNER OR <br />ENGINEER OF DISCREPANCIES. <br />2. ALL SANITARY SEWER, STORM SEWER AND WATER MAIN INSTALLATIONS SHALL BE PER <br />MINNESOTA PLUMBING CODE AND IN ACCORDANCE WITH THE CURRENT EDITION OF <br />"STANDARD SPECIFICATIONS FOR WATER MAIN AND SERVICE LINE INSTALLATION AND <br />SANITARY SEWER AND STORM SEWER INSTALLATION" AS PREPARED BY THE CITY <br />ENGINEERS ASSOCIATION OF MINNESOTA. <br />3. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL OBTAIN THE NECESSARY FEDERAL, <br />STATE AND LOCAL PERMITS FOR THE PROPOSED WORK OR VERIFY WITH THE OWNER OR <br />ENGINEER THAT PERMITS HAVE BEEN OBTAINED. PERMIT FEES SHALL BE THE <br />RESPONSIBILITY OF THE CONTRACTOR UNLESS OTHERWISE ARRANGED WITH THE OWNER. <br />4. CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATION AND <br />DIMENSIONS OF DOORWAYS, RAMPS, TRUCK DOCKS, PRECISE BUILDING DIMENSIONS AND <br />EXACT BUILDING UTILITY CONNECTION LOCATIONS. <br />5. ALL PRIVATE UTILITIES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE SPECIFICATIONS <br />OF THE APPROPRIATE UTILITY COMPANY. THE CONTRACTOR SHALL COORDINATE THE <br />SERVICE LINE CONSTRUCTION WITH THE UTILITY COMPANIES. <br />6. CONTRACTOR SHALL OBTAIN ALL NECESSARY CITY PERMITS FOR UTILITY CONNECTIONS, <br />AND UTILITIES SHALL BE INSPECTED AND APPROVED BY THE CITY. THE CITY SHALL BE <br />NOTIFIED 48 -HOURS PRIOR TO COMMENCING WITH THE UTILITY CONSTRUCTION OR ANY <br />REQUIRED TESTING. CONTRACTOR SHALL NOT OPERATE, INTERFERE WITH, CONNECT ANY <br />PIPE OR HOSE TO, OR TAP ANY WATER MAIN BELONGING TO THE CITY UNLESS DULY <br />AUTHORIZED TO DO SO BY THE CITY. ANY ADVERSE CONSEQUENCES OF SCHEDULED OR <br />UNSCHEDULED DISRUPTIONS OF SERVICE TO THE PUBLIC ARE TO BE THE RESPONSIBILITY <br />OF THE CONTRACTOR. <br />7. WATER MAIN LENGTHS AS SHOWN ARE APPROXIMATE HORIZONTAL LENGTHS. ALLOW FOR <br />ADDITIONAL PIPE WHEN INSTALLING ON SLOPES OR WHEN DEFLECTIONS ARE REQUIRED. <br />THE JOINT DEFLECTIONS SHALL NOT EXCEED THE MAXIMUM RECOMMENDED BY THE PIPE <br />MANUFACTURER OR BY LOCAL GOVERNING SPECIFICATIONS. FITTINGS REQUIRED TO <br />CONSTRUCT WATER MAIN SHALL BE INCLUDED IN WATER MAIN CONSTRUCTION. <br />8. PROVIDE WATER MAIN THRUST RESTRAINTS PER CITY STANDARD REQUIREMENTS. <br />9. A MINIMUM VERTICAL SEPARATION OF 18 INCHES IS REQUIRED AT ALL WATER MAIN <br />CROSSINGS WITH SANITARY SEWER OR STORM SEWER. <br />10. UTILITY SERVICES TYPICALLY TERMINATE 5' OUTSIDE BUILDING WALL UNLESS OTHERWISE <br />SHOWN OR NOTED. <br />11. ALL MATERIALS SHALL COMPLY WITH THE REQUIREMENTS OF THE CITY. <br />12. ALL WATER LINES SHALL BE DUCTILE IRON WRAPPED IN POLYETHYLENE, CLASS 52 WITH <br />7.5' MINIMUM COVER. PROVIDE MINIMUM SEPARATION OF 18" FROM SANITARY SEWER & <br />STORM SEWER. INSULATE WATER MAIN IF LESS THAN 7.5' OF COVER. <br />13. INSULATION SHALL BE DOW STYROFOAM HI BRAND 35 OR EQUIVALENT, WITH 4 INCHES OF <br />THICKNESS. <br />14. SANITARY SEWER PIPE OUTSIDE THE BUILDING ENVELOPE SHALL BE POLYVINYL CHLORIDE <br />(PVC) SDR 35 OR 26. SDR 26 IS REQUIRED FOR DEPTHS GREATER THAN 15 FEET. <br />SANITARY SEWER PIPE WITHIN 5 FEET OF BUILDING AND UNDER FOOTINGS, PIPE SHALL BE <br />PVC SCHEDULE 40. <br />15. STORM SEWER PIPE SHALL BE REINFORCED CONCRETE PIPE (CLASS 5 FOR PIPE <br />DIAMETERS 18" AND SMALLER, CLASS 3 FOR PIPE DIAMETERS 21" AND LARGER UNLESS <br />OTHERWISE NOTED) WITH R-4 GASKETS, OR HDPE STORM SEWER PIPE IF ALLOWED BY THE <br />CITY. HDPE STORM PIPE SHALL MEET REQUIREMENTS OF ASTM F2648. PIPE SHALL BE <br />WATER TIGHT ACCORDING TO ASTM D3212 REQUIREMENTS. SEE PLAN FOR LOCATIONS <br />WHERE RCP IS REQUIRED. PVC STORM SEWER PIPE SHALL BE SCHEDULE 40 PIPE. FLARED <br />END SECTIONS SHALL BE RCP WITH TRASH GUARDS & RIP -RAP. <br />STORM <br />SEWER CASTING <br />SCHEDULE <br />STRUCTURE <br />NUMBER TYPE <br />DIA. <br />CASTING TYPE <br />101 <br />FES <br />18" 1----- <br />102 <br />CBMH <br />48" <br />R-3067 <br />103 <br />CBMH <br />48" <br />R-3067 <br />104 <br />CBMH <br />48" <br />R-3067 <br />105 <br />CBMH <br />48" <br />R-3067 <br />106 <br />CBMH <br />2'x3' <br />R-3067 <br />201 <br />STMH <br />48" <br />R -1642B <br />202 <br />STMH <br />48" <br />R -1642B <br />203 <br />STMH <br />48" <br />R -1642B <br />204 <br />STMH <br />48" <br />R -1642B <br />205 <br />STMH <br />48" <br />R -1642B <br />206 <br />CBMH <br />2'x3' <br />R-3067 <br />207 <br />CBMH <br />2'x3' <br />R-3067 <br />208 <br />CBMH <br />2'x3' <br />R-3067 <br />209 <br />CBMH <br />2'x3' <br />R-3067 <br />210 <br />CBMH <br />2'x3' <br />R-3067 <br />301 <br />AREA DRAIN <br />12" <br />NYLOPLAST <br />302 <br />AREA DRAIN <br />12" <br />NYLOPLAST <br />Orono Senior <br />Housing <br />Orono, Minnesota <br />0' 30' 60' 90' <br />0011740UTPOl.dwg <br />Date: 06/19/17 Sheet: 6 OF 13 <br />Utility Plan <br />