My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-16-2018 Planning Commission Packet
Orono
>
Planning Commission
>
2018
>
04-16-2018 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 3:54:11 PM
Creation date
1/14/2020 3:27:06 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
©2018 Westwood Professional Services, Inc. <br />cU <br />N <br />- SAN <br />\10e , <br />1025.20) <br />C 1024.1 RhW J <br />1012.43 INV E ` <br />101s2.14 INV W <br />POH - <br />Westwood <br />Phone (952) 937-5150 12701 Whitewater Drive, Suite #300 <br />Fax (952) 937-5822 Minnetonka, MN 55343 <br />Toll Free (888) 937-5150 westwoodps.com <br />Westwood Professional Services, Inc. <br />1023 <br />)7 <br />l C <br />_ YZA TA BOULEVARD WEST <br />;_7 <br />I hereby certify that this plan was prepared by me or under my <br />direct supervision and that I am a duly licensed PROFESSIONAL <br />ENGINEER under ffie laws of the State of Minnesota <br />%R11L <br />Ryan K Bluhm <br />Date 03/20/18 License No. 41257 <br />Revisions <br />08/07/17 - City Comments <br />03/20/18 - Final Development Approval Plans <br />Call 48 Hours before digging: <br />811 or cal1811.com <br />Grading Legend Grading Notes Common Ground Alliance <br />EXISTING PROPOSED <br />1. LOCATIONS AND ELEVATIONS OF EXISTING TOPOGRAPHY AND UTILITIES AS SHOWN ON THIS <br />PROPERTY LINE PLAN ARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY SITE CONDITIONS AND <br />-980- _�98o- INDEX CONTOUR UTILITY LOCATIONS PRIOR TO EXCAVATION/CONSTRUCTION. THE ENGINEER SHALL BE <br />-982 -982 _ INTERVAL CONTOUR NOTIFIED IMMEDIATELY IF ANY DISCREPANCIES ARE FOUND. <br />CURB AND GUTTER 2. CONTRACTORS SHALL REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATIONS AND <br />to RIDGE LINE DIMENSIONS OF VESTIBULE, SLOPED PAVEMENT, EXIT PORCHES, RAMPS, TRUCK DOCKS, <br />PRECISE BUILDING DIMENSIONS, EXACT BUILDING UTILITY ENTRANCE LOCATIONS, AND <br />SILT FENCE EXACT LOCATIONS AND NUMBER OF DOWNSPOUTS. <br />Sro® ►► ■ STORM SEWER <br />/ V 3. ALL EXCAVATION SHALL BE IN ACCORDANCE WITH THE CURRENT EDITION OF STANDARD <br />-7025- / (`P RIPRAP SPECIFICATIONS FOR TRENCH EXCAVATION AND BACKFILL/SURFACE RESTORATION" AS <br />� 1024 <br />/ Qwar WATER MAIN PREPARED BY THE CITY ENGINEERS ASSOCIATION OF MINNESOTA. <br />SAN ► SANITARY SEWER 4. ALL DISTURBED UNPAVED AREAS ARE TO RECEIVE FOUR INCHES OF TOPSOIL AND SOD OR <br />Q� \ ROCK EXIT SEED. THESE AREAS SHALL BE WATERED UNTIL A HEALTHY STAND OF GRASS IS <br />OBTAINED. SEE LANDSCAPE PLAN FOR PLANTING AND TURF ESTABLISHMENT. <br />3 <br />�-1022.92 RIM \ FIBER BLANKET 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING TRAFFIC <br />1014.89 /NV. W -S \ <br />91.00 CONTROL DEVICES SUCH AS BARRICADES, WARNING SIGNS, DIRECTIONAL SIGNS, FLAGMEN <br />-WAT No �-1021.58 RIM XXs1.00 SPOT ELEVATION AND LIGHTS TO CONTROL THE MOVEMENT OF TRAFFIC WHERE NECESSARY. PLACEMENT OF <br />WA 12.02 INV N -S THESE DEVICES SHALL BE APPROVED BY THE ENGINEER PRIOR TO PLACEMENT. TRAFFIC <br />war O U INLET PROTECTION CONTROL DEVICES SHALL CONFORM TO APPROPRIATE MNDOT STANDARDS. <br />D so \ <br />*4 RETAINING WALL 6. ALL SLOPES SHALL BE GRADED TO 3:1 OR FLATTER, UNLESS OTHERWISE INDICATED ON <br />THIS SHEET. <br />102 .3 STo 1022.0 \ o i <br />o o 7. CONTRACTOR SHALL UNIFORMLY GRADE AREAS WITHIN LIMITS OF GRADING AND PROVIDE A <br />_ 1022.44 '� ro SMOOTH FINISHED SURFACE WITH UNIFORM SLOPES BETWEEN POINTS WHERE ELEVATIONS <br />kill.Z Q 1022.1 1 <br />ARE SHOWN OR BETWEEN SUCH POINTS AND EXISTING GRADES. <br />_ � "�\ � <br />7 <br />0 <br />�3 <br />6 <br />- <br />13. PRIOR TO PLACEMENT OF ANY STRUCTURE OR PAVEMENT, A PROOF ROLL, AT MINIMUM, <br />\ <br />1 \1020.16 RIM \ <br />_loi <br />V1 <br />10 <br />�g <br />8. <br />SPOT ELEVATIONS SHOWN INDICATE FINISHED PAVEMENT ELEVATIONS & GUTTER FLOW LINE <br />9.\ INV w -SE <br />�� <br />- <br />FAILURE SHALL BE EXCAVATED AND RECOMPACTED AS SPECIFIED HEREIN. <br />UNLESS OTHERWISE NOTED. PROPOSED CONTOURS ARE TO FINISHED SURFACE GRADE. <br />14. EMBANKMENT MATERIAL PLACED BENEATH BUILDINGS AND STREET OR PARKING AREAS <br />SHALL BE COMPACTED IN ACCORDANCE WITH THE SPECIFIED DENSITY METHOD AS <br />OUTLINED IN MNDOT 2105.31`1 AND THE REQUIREMENTS OF THE GEOTECHNICAL ENGINEER. <br />15. EMBANKMENT MATERIAL NOT PLACED IN THE BUILDING PAD, STREETS OR PARKING AREA, <br />9. <br />SEE SOILS REPORT FOR PAVEMENT THICKNESSES AND HOLD DOWNS. <br />I <br />\�� <br />10. <br />CONTRACTOR SHALL DISPOSE OF ANY EXCESS SOIL MATERIAL THAT EXISTS AFTER THE <br />-1020.80 �qr <br />GEOTECHNICAL ENGINEER. EXCAVATION FOR THE PURPOSE OF REMOVING UNSTABLE OR <br />H WL=1013.0 <br />UNSUITABLE SOILS SHALL BE COMPLETED AS REQUIRED BY THE GEOTECHNICAL ENGINEER. <br />SITE GRADING AND UTILITY CONSTRUCTION IS COMPLETED. THE CONTRACTOR SHALL <br />DISPOSE OF ALL EXCESS SOIL MATERIAL IN A MANNER ACCEPTABLE TO THE OWNER AND <br />-1020.7 8 <br />� <br />AND INSPECTIONS WITH THE GEOTECHNICAL ENGINEER. <br />n <br />THE REGULATING AGENCIES. <br />T-1\�� 00 <br />�yq <br />r\ <br />-1020.E <br />11. <br />CONTRACTOR SHALL PROVIDED A STRUCTURAL RETAINING WALL DESIGN CERTIFIED BY A <br />-T-;n-", nn-�_ I <br />LICENSED PROFESSIONAL ENGINEER <br />�T-1025.70 <br />--B-1017.93 <br />T-1026.00 <br />B-1017.82 <br />,'l 1009 <br />�104912. ALL CONSTRUCTION SHALL CONFORM TO LOCAL, STATE AND FEDERAL RULES INCLUDING <br />THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT <br />\ <br />REQUIREMENTS. <br />6 <br />- <br />13. PRIOR TO PLACEMENT OF ANY STRUCTURE OR PAVEMENT, A PROOF ROLL, AT MINIMUM, <br />\ <br />WILL BE REQUIRED ON THE SUBGRADE. PROOF ROLLING SHALL BE ACCOMPLISHED BY <br />_loi <br />V1 <br />MAKING MINIMUM OF 2 COMPLETE PASSES WITH FULLY -LOADED TANDEM -AXLE DUMP <br />ro <br />TRUCK, OR APPROVED EQUAL, IN EACH OF 2 PERPENDICULAR DIRECTIONS WHILE UNDER <br />SUPERVISION AND DIRECTION OF THE INDEPENDENT TESTING LABORATORY. AREAS OF <br />- <br />FAILURE SHALL BE EXCAVATED AND RECOMPACTED AS SPECIFIED HEREIN. <br />14. EMBANKMENT MATERIAL PLACED BENEATH BUILDINGS AND STREET OR PARKING AREAS <br />SHALL BE COMPACTED IN ACCORDANCE WITH THE SPECIFIED DENSITY METHOD AS <br />OUTLINED IN MNDOT 2105.31`1 AND THE REQUIREMENTS OF THE GEOTECHNICAL ENGINEER. <br />15. EMBANKMENT MATERIAL NOT PLACED IN THE BUILDING PAD, STREETS OR PARKING AREA, <br />SHALL BE COMPACTED IN ACCORDANCE WITH REQUIREMENTS OF THE ORDINARY <br />CD <br />COMPACTION METHOD AS OUTLINED IN MNDOT 2105.3F2. <br />16. ALL SOILS AND MATERIALS TESTING SHALL BE COMPLETED BY AN INDEPENDENT <br />NWL=1009.0 EXISTING POND <br />WL t <br />GEOTECHNICAL ENGINEER. EXCAVATION FOR THE PURPOSE OF REMOVING UNSTABLE OR <br />H WL=1013.0 <br />UNSUITABLE SOILS SHALL BE COMPLETED AS REQUIRED BY THE GEOTECHNICAL ENGINEER. <br />(PER DESIGN PLAN) <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL REQUIRED SOILS TESTS <br />� <br />AND INSPECTIONS WITH THE GEOTECHNICAL ENGINEER. <br />n <br />Erosion Control Notes <br />1009- <br />10 10 <br />009- <br />1010 <br />RMB Prepared for: Apex HLLC <br />Checked: RMB <br />Drawn: SYE 2110 Lyndale Avenue South Suite C <br />Record Drawing by�date Minneapolis, MN 55405 <br />1. SILT FENCE WILL BE INSTALLED AROUND SITE IN ALL FILL AREAS AND LOCATIONS WHERE <br />STORM WATER RUNOFF MAY LEAVE THE SITE, PRIOR TO ANY EXCAVATION/CONSTRUCTION <br />ACTIVITIES. <br />2. ROCK CONSTRUCTION ENTRANCE WILL BE INSTALLED AT ALL CONSTRUCTION ENTRANCES. <br />3. SILTATION AND EROSION CONTROL: THE CONTRACTOR SHALL ASSUME COMPLETE <br />RESPONSIBILITY FOR CONTROLLING ALL SILTATION AND EROSION OF THE PROJECT AREA. <br />THE CONTRACTOR SHALL USE WHATEVER MEANS NECESSARY TO CONTROL THE EROSION <br />AND SILTATION INCLUDING BUT NOT LIMITED TO CATCH BASIN INSERTS, ROCK <br />CONSTRUCTION ENTRANCES, EROSION CONTROL BLANKET, AND SILT FENCE. CONTROL SHALL <br />COMMENCE WITH GRADING AND CONTINUE THROUGHOUT THE PROJECT UNTIL ACCEPTANCE <br />OF THE WORK BY THE OWNER. THE CONTRACTOR'S RESPONSIBILITY INCLUDES ALL <br />IMPLEMENTATION AS REQUIRED TO PREVENT EROSION AND THE DEPOSITING OF SILT. THE <br />OWNER MAY DIRECT THE CONTRACTOR'S METHODS AS DEEMED FIT TO PROTECT PROPERTY <br />AND IMPROVEMENTS. ANY DEPOSITION OF SILT OR MUD ON NEW OR EXISTING PAVEMENT OR <br />IN EXISTING STORM SEWERS OR SWALES SHALL BE REMOVED AFTER EACH RAIN AFFECTED <br />AREAS SHALL BE CLEANED TO THE SATISFACTION OF THE OWNER, ALL AT THE EXPENSE <br />OF THE CONTRACTOR. ALL TEMPORARY EROSION CONTROL SHALL BE REMOVED BY THE <br />CONTRACTOR AFTER THE TURF IS ESTABLISHED. <br />4. CONTRACTOR SHALL INSTALL TEMPORARY INLET PROTECTION (WIMCO OR EQUIVALENT) <br />AROUND ALL CATCH BASIN GRATE INLETS, AFFECTED BY THIS CONSTRUCTION. <br />5. ALL DISTURBED AREAS SHALL HAVE TEMPORARY PROTECTION OR PERMANENT COVER OVER <br />EXPOSED SOIL AREAS IF NOT BEING ACTIVELY GRADED WITHIN SEVEN (7) DAYS. <br />6. FOR AREAS WITH SLOPE OF 3:1 OR GREATER, RESTORATION WITH SOD OR WOOD FIBER <br />BLANKET IS REQUIRED. <br />7. PUBLIC STREETS USED FOR HAULING SHALL BE KEPT FREE OF SOIL AND DEBRIS. STREET <br />SWEEPING SHALL BE COMPLETED DAILY. <br />Orono Senior <br />Housing <br />Orono, Minnesota <br />0011740GDPOl .dwg <br />Date: 06/19/17 Sheet: 5 OF 13 <br />Grading, Drainage & <br />Erosion Control Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.