My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999 - soil observations/test pit observations
Orono
>
Property Files
>
Street Address
>
W
>
Wayzata Boulevard West
>
2190 Wayzata Blvd W - 34-118-23-21-0033
>
Land Use
>
1999 - soil observations/test pit observations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:55:23 PM
Creation date
1/13/2020 2:04:27 PM
Metadata
Fields
Template:
x Address Old
House Number
2190
Street Name
Wayzata
Street Type
Boulevard
Street Direction
West
Address
2190 Wayzata Boulevard West
Document Type
Land Use
PIN
3411823210033
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Rich Kieman 3 March 1, 1999 <br /> GME Project No. 8216 <br /> Based on the test pits, it is my opinion the foundations will be bearing <br /> on naturally-occurring silty clay with a trace of sand. Based on SCP <br /> testing at the test pit locations, this material should be suitable for <br /> the assumed soil bearing value of 2, 000 psf . <br /> I recommended that all footings be lowered below the existing fill, to <br /> rest on naturally-occurring soil . Based on review of surface contours and <br /> available minimal elevation information, frost footings around the <br /> perimeter should bear on naturally-occurring soil . I recommend the three <br /> interior column pads, designed to rest directly below the slab, be lowered <br /> to rest on the naturally-occurring soil, or the existing fill be removed, <br /> and fill be placed to re-attain design footing elevation. <br /> Mr. Weibel indicated they would be excavating for footings tomorrow, and <br /> requested a foundation base soil observation testing visit at 2 : 00 to <br /> 2 :30 pm on March 2, 1999 . In reviewing the Special Inspections required <br /> for this project and structural drawings, we are to observe reinforcing <br /> steel installation during footing construction, perform periodic masonry <br /> special inspection, and observe and test welded and bolted connections . <br /> SJR:rma <br /> C:\SJR\8216.MEM <br /> GME CONSULTANTS.INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.