Laserfiche WebLink
Orono Station West <br /> Plumbing <br /> Plan No.PLB1508-00306 <br /> Page 3 <br /> September 9,2015 <br /> 11. The copper water distribution piping must meet ASTM Standard B88 see Minnesota Rules. <br /> part 4715.0520). Solder and flux for potable water systems shall contain less than 0.2 percent lead. Solder <br /> other than 95-5 tin antimony or 96-4 tin silver must be approved by the administrative authority prior to use. <br /> Joints must include noncorrosive paste-type flux complying with ASTM BR 13-00. <br /> 12. PVC plastic pipe used for the dram,waste,and vent system shall comply with ASTM Standard D2665, <br /> D2949 or F891 (see Minnesota Rules,pan 4715.0570 through pan 4715.0600). PVC solvent weld joints <br /> must include a primer of contrasting color to the pipe and cement(see Minnesota Rules,part 4715.0810. <br /> subpart 2). Plastic pipe must be installed in accordance with Minnesota Rules,part 4715.0550 through <br /> part 4715.0600. Above-grade horizontal runs cannot exceed 35 feet in total length. <br /> 13. Cross-link polyethylene(PEX)tubing must meet Minnesota Rules.pan 4715.0520: <br /> a. The tubing system must comply with ASTM F877 and F876. <br /> b. When installed as a system in accordance with ASTM F877.the system tubing and finings must be of <br /> the same manufacturer and be marked as required. <br /> c. When not installed as a system,the fittings must be marked with ASTM F1807.F1960.F2080.F2098- <br /> 01.or F2159. The tubing must list the fitting and tubing standard. <br /> d. Installers must he factory trained and possess a card documenting completion of training. <br /> 14. Above-grade horizontal plumbing piping must be supported as follows(see Minnesota Rules. <br /> part 4715.1430.subpart 4): <br /> a. Plastic pipe:ut least every 32 inches. <br /> b. Copper tubing(I!.-inch or less):at least every 6 feet. <br /> 15. The water distribution system shall be disinfected per Minnesota Rules.part 4715.2250. <br /> 16. The plumbing system shall be tested in accordance with Minnesota Rules.part 4715.2820. <br /> 17. Complete plans and specifications must be submitted to and approved by the Minnesota Department of <br /> Agriculture. Contact the Dairy.Food.Feed&Meat Inspection Division at 651201-6027 regarding <br /> information necessary for their plan review and licensing requirements. <br /> NOTES: <br /> 1. The scope of this project consists of the remodel of an existing building. The plumbing installation includes <br /> a counter sink,coffee machines.cappuccino machines.a post-mix soda system,an ice maker.two lavatories. <br /> a urinal.two tank-type water closets,two floor drains.an instantaneous water heater.and a 6-gallon water <br /> heater. <br /> 2. This facility is served by existing municipal sewer and water service connections. <br /> 3 The plans and specifications were prepared by a licensed plumber. Only the plumber who has prepared the <br /> plans may use the plans for construction If another plumber is contracted to install the plumbing.they must <br /> submit their own plans and specifications for the project. <br /> 4. The 2012 Minnesota Plumbing Code is available on our website at:ww•w.dli.mn.gov,CCLD'Plumbtng.asp <br />