Laserfiche WebLink
�O` O <br /> • <br /> O <br /> CITY of ORONO <br /> ��� A <br /> �.� `�l �1•11 �'\ G~ <br /> RESOLUTION OF THE CITY COUNCIL <br /> t` -kEsil& NO.V 4 5 5 8 <br /> 3) The Development Plan shall meet all setback standards for <br /> building construction.and parking as established under the B - 6 <br /> Highway Commercial District requirements, as defined in the <br /> following table: <br /> Building/Development Standards Required <br /> Lot Area 2.0 acre min. <br /> Lot Width 100' <br /> Principal Structure Front(S) 30' <br /> Setbacks <br /> Side(E) 35' <br /> 0 Side (W) 10' <br /> Rear(N) '35' — <br /> Parking Setbacks Front(S) 15' <br /> -includes driving lanes <br /> Side(E) 10' <br /> Side(W) 5' <br /> Rear(N) 10' <br /> Building Height Peak Height N/A <br /> Defined Height 30' max. <br /> The above table values are based on the B-6 standards found in <br /> Section 78-797 (1-5) of the Zoning Ordinance. <br /> 4) Appropriate traffic and parking signage within the property shall <br /> be installed subject to the Orono staff and City Engineer review <br /> and approval. <br /> 5) Applicant shall demonstrate to the Council's satisfaction that the <br /> front facade of the buildings, as noted in Exhibit A, and <br /> 0 specifically implementation of an architectural feature to the roof, <br /> are incorporated so as to break up the expanse of the front view of <br /> the roof. <br /> Page 5 of 12 <br />