Laserfiche WebLink
Page of <br /> BRAUN -dfri 3107 <br /> I NTE BTEC Daily Field Notes <br /> ' rroject No.: 'Z-.-i< - ' /. 7(.7/11 4 Date: 1/249--// Report No.: !'1 <br /> Project Name: Qr.- wm ,Sa.1 i . , 7 ws . '-�/ Project Location: 4 / ''-�.-c g-L.`. '71►.. <br /> Client: Kra-6.-f— S c' -t O Temp/Weather: `F/ C..-- a- ,_-__..46.7..Project Manager: . - /1 - _-.*--.- Time Arrived: Departed: <br /> Services Performed <br /> ❑ Compaction Testing ❑ Concrete Testing Cylinder Pickup ❑ Proctor Pickup ❑ Masonry Pickup <br /> ❑ DCP ❑ Other(describe) / / <br /> Density Testing <br /> Areas Tested: ❑ Mass Grading ❑ Building P.d ❑ Wall Backfill ❑ Slab Subgrade ❑ Parking/Walks <br /> ❑ Utilities ❑ Roadways ❑ Bitumin. s ❑ Other(describe) <br /> Method: ❑ Nuclear ❑ Sandcone I #of tests: / I Fill Source: O On-site ❑ Imported <br /> Tests taken met specification? ❑ Yes / ❑ No ❑ Waiting on Proctor results? <br /> Contractor notified of test results? ❑ Yes ❑ No (Name of person notified: <br /> Concrete Testing Information <br /> Areas Tested: ❑ Footing 0/Slab on Grade ❑ Deck ❑ Columns/Piers ❑ Walls <br /> Pile Cap/Pile fill ❑ Pavement 0 Curb&Gutter ❑ Other(describe) <br /> C <br /> No. of placements: Yards per pla5Lment: Method of placement: <br /> Set # Cylinder Size Air% Slump /Temp Mix Supplier Spec. Strength Workorder# <br /> / <br /> i <br /> Contractor notified of test results? ❑ Yes ❑ No, Name of person notified: <br /> Overall Remarks/Comments (Explain any concerns,problems or unusual occurrences) <br /> Was everything available to test/observe? I% Yes ❑ No Were there any delays? (Explain below if yes) ❑ Yes / No <br /> Was a copy of this rep rt left on site? ❑ Yes ` No If so,whom was it submitted to: <br /> Comments: t 2 D /..e.-1/, ( . e' /4- -.G•-,S- O <br /> // .._ _ 77 <br /> formed By: r Reviewed by: LI Date: //--9/ <br /> This is a preliminary repo nd is provided solely as evidence that field observations and/or testing was performed. Observations and/or conclusions <br /> and/or recommendati conveyed in the final report may vary from,and shall take precedence,over those indicated in a preliminary report. <br /> • Providing engineering and environmental solutions since 1957 <br />