Laserfiche WebLink
Page ( of f <br /> B R A V N cnu-1fn 4/0 <br /> I NTE RTEC Daily Field Notes <br /> rroject No.: t3L - 11- 0 I UI y/k Date: 11 /zS/)i Report No.: I <br /> Project Name: - o.- f ist t'-,c, / I) Project Location: 1-{t„)... i2 4- Lo cc L.'..-1-,..'1, 0,0„r "IN <br /> Client: V- /\ (c..1.j cc. Temp/Weather: --4I' / S u h vI ) <br /> Project Manager: .R.,-..d Ai((,,,-Ir— Time Arrived: Departed: <br /> Services Performed <br /> ❑ Compaction Testing ❑ Concrete Testing 1 Cylinder Pickup ❑ Proctor Pickup ❑ Masonry Pickup <br /> ❑ DCP ❑ Other(describe) <br /> Density Testing <br /> Areas Tested: ❑ Mass Grading ❑ Building Pad • Wall Backfill ❑ Slab Subgrade ❑ Parking/Walks <br /> ❑ Utilities ❑ Roadways ❑ Bituminous II Other(describe) <br /> Method: ❑ Nuclear ❑ Sandcone I # of tests: I Fil/Source: ❑ On-site ❑ Imported <br /> Tests taken met specification? ❑ Yes No ❑ Waiting on Proctor results? <br /> Contractor notified of test results? ❑ Yes ❑ No Name f person notified: <br /> Concrete Testing Information <br /> Areas Tested: ❑ Footing ❑ Slab on Grade Deck ❑ Columns/Piers ❑ Walls <br /> Pile Cap/Pile fill ❑ Pavement ❑ Curb& Gutter ❑ Other(describe) <br /> No. of placements: Yards per placement: ix <br /> Method of placement: <br /> Set # Cylinder Size Air% Slum Tem P p Supplier Spec. Strength Workorder# <br /> _ . / <br /> Contractor notified of test results? ❑ Yes ❑ No, Name of person notified: <br /> Overall Remarks/Comments (Explain any concerns,problems or unusual occurrences) <br /> Was everything available to test/observe? M Yes ❑ No Were there any delays? (Explain below if yes) ❑ Yes 0 No <br /> Was a copy of this report left on site? 50 Yes ❑ No If <br /> If so,whom was it submitted to: k,;-IL c( le_ <br /> Comments: 0.., 4,1, ,,,'4, S ✓c r„„).� his 1(,�c caast i 1 U,�..4 '�, o ci <br /> )t_ . .pr /Y.s. ,h� Lei .-f? 4— c-c/(.(.�1- rR,-.c-c_ r e4/.r�,�.r -1-4.-dL_?• ec.s!' //iCV/ , <br /> formed By: "Peer a 11 — Reviewed by: L� Date: 1��Z67/// <br /> This is a preliminary report and i rovided solely as evidence that field observations and/or testing was performed. Observations and/or conclulions <br /> and/or recommendations conveyed in the final report may vary from,and shall take precedence,over those indicated in a preliminary report. <br /> • Providing engineering and environmental solutions since 1957 <br />