My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Special Structural Testing & Inspection Schedule
Orono
>
Property Files
>
Street Address
>
W
>
Wayzata Boulevard West
>
0875 Wayzata Boulevard West - 35-118-23-44-0011
>
Misc
>
Special Structural Testing & Inspection Schedule
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:00:03 PM
Creation date
1/6/2020 9:51:49 AM
Metadata
Fields
Template:
x Address Old
House Number
875
Street Name
Wayzata
Street Type
Boulevard
Street Direction
West
Address
875 Wayzata Boulevard West
Document Type
Misc
PIN
3511823440011
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kraus-Anderson Construction Company <br /> Project BL-11-01014A <br /> March 13, 2012 <br /> Page 3 <br /> Concrete Compressive Strength Testing <br /> The cast concrete cylinders were temporarily stored at the site and then returned to our laboratory for <br /> moist curing and testing.The results of the concrete compressive strength testing were forwarded to the <br /> interested parties under a separate cover as they became available. <br /> General <br /> In performing its services, Braun Intertec used that degree of care and skill ordinarily exercised under <br /> similar circumstances by reputable members of its profession currently practicing in the same locality. No <br /> warranty, express or implied, is made. <br /> Thank you for the opportunity to provide the special inspection and testing services for this project. After <br /> review of the attached Special Inspection Final Report, if you have any questions or require additional <br /> information, please call Brad McCarter at 952.995.2268, or Gregg Jandro at 952.995.2270. <br /> Sincerely, <br /> BRAUN INTERTEC CORPORATION <br /> Bradley,J. McCarter, PE <br /> Preje Engineer <br /> Gregg R.Jandro, PE, PG <br /> Vice President—Principal Engineer <br /> Attachment: <br /> Non-Structural Steel Special Inspection Final Report <br /> c: Keith Ringold, Kraus Anderson Construction Company <br /> Jared Reigstad, Reigstad &Associates, Inc. <br /> Steve Johnston, Rho Development Consulting <br /> Dan Neudecker, Pope Associates, Inc. <br /> Rx <br />
The URL can be used to link to this page
Your browser does not support the video tag.