Laserfiche WebLink
Page 2 of 3 ESR-1136 <br /> 4.0 INSTALLATION 5.2 Installation shall be by installers authorized by Smoke <br /> 4.1 General: Guard®Corporation. <br /> 5.3 For areas adopting the SBC,the Smoke Guard®System <br /> Installation of the system shall comply with this report and is permitted to be used as an alternative to the enclosed <br /> published instructions. Smoke Guard Corporation's elevator lobby required for Group B and R high-rise <br /> installation instructions shall be available at the jobsite at all buildings. A separate protected lobby, in addition to a <br /> times during installation. fire-resistance-rated corridor, is not required under the <br /> The system shall be surface-mounted or flush-mounted. following conditions: <br /> The maximum elevator door opening width shall not exceed 5.3.1 The elevator doors protected by the Smoke <br /> 48 inches (1219 mm) for the Model 200 system, 64 inches Guard® System shall open into a fire- <br /> (1626 mm)for the Model 400, and 72 inches(1829 mm)for resistance-rated corridor with one-hour <br /> the Model 600.The frame surrounding the elevator door shall construction and 20-minute opening <br /> be a minimum of No. 14 gage [0.0747 inch (1.9 mm)] steel protectives. <br /> with a 2-inch-wide(51 mm)flat profile.Nonferrous or beveled <br /> frames require the installation of auxiliary steel rails. 5.3.2 The protected elevators shall not be used as <br /> an accessible means of egress, and the fire- <br /> The basic installation consists of a sheet metal mounting <br /> plate attached to the wall above the elevator hoistway frame. resistance-rated not be used as an area of refuge. <br /> corridorsserving the elevators <br /> shall <br /> The Smoke Guard System housing is attached to the <br /> mounting plate,except for the Model 200 and the Model 400, 5.3.3 One required exit shall be accessible without <br /> which can be attached directly to the wall.Joints between the travel in front of elevators protected with the <br /> housing and the head of the hoistway frame shall be sealed Smoke Guard®System. <br /> with the silicone sealant noted in Section 3.1.5. 5.4 The Smoke Guard®System shall be cycle-tested by the <br /> Installation of the Model 600 on hoistways that exceed 64 building owner of record or owner's representative on a <br /> inches(1626 mm)in width requires the use of a coved base. semiannual basis.A permanent record of the cycle tests <br /> At the floor level,two coved base clips shall be placed in the shall be retained by the building owner of record or the <br /> lobby-side floor in direct line and in contact with the existing owner's representative. <br /> hoistway frame.The joints between the clips and frame shall 5.5 A smoke detector complying with UL 268 shall be <br /> be sealed with the silicone sealant noted in Section 3.1.5. installed at the ceiling in front of the elevator doors.The <br /> The drive control power leads are connected to a 120-volt smoke detector shall be equipped with an auxiliary <br /> electrical system. Alarm signal leads are connected to the contact and battery backup(not provided by the Smoke <br /> elevator lobby smoke detector.The low-voltage power leads Guard® System control station) or an emergency <br /> on the Model 600 are connected to a rewind switch. electrical system. <br /> The film is unrolled to magnetically adhere to either the 5.6 The units shall be used with fire-resistance-rated <br /> hoistway frame or auxiliary rails.The magnets are adjusted to elevator doors in order to comply with the "S" label <br /> align with the hoistway jambs and the film is stretched tightly requirements for tight-fitting smoke and draft control <br /> across the hoistway opening.The film is adjusted vertically so assemblies in accordance with Section 1004.3.4.3.2.1 <br /> the bottom threshold is in contact with the floor.Any slack is of the UBC and the requirements of Section 714.2.3 of <br /> adjusted upward into the housing.After initial adjustment the the IBC,allowing the elevator door to open directly into <br /> film shall be unrolled again to check the seating in the cove the fire-resistance-rated corridor, and eliminating the <br /> bases(where used) and vertical alignment. Line slack shall need for a fully enclosed lobby as described in Section <br /> be removed and adjusted to provide equal tension between 707.14.1 of the IBC,Section 1004.3.4.5 of the UBC,and <br /> cables. Section 412.6 of the SBC. <br /> 4.2 Final Adjustment and Inspection: 5.7 Units are manufactured at 11420 Executive Drive, <br /> Boise, Idaho, under a quality control program with <br /> After the installation is complete,the installer shall perform a inspections by Omega Point Laboratories(AA-657). <br /> final adjustment and inspection of the system. The rewind <br /> motor shall be engaged and inspected for operation. Fall of 6.0 EVIDENCE SUBMITTED <br /> the apparatus shall be inspected, with adjustments to the 6.1 Manufacturer's descriptive literature, specifications, <br /> cable tension made as required. The process shall be published installation instructions and engineering <br /> repeated five times to verify functionality.The magnetic strips drawings. <br /> shall be attached and the area between the top of the film and <br /> the housing set with silicone sealant. After installation, the 6.2 Data in accordance with the ICC-ES Acceptance <br /> system shall be maintained as stated in Section 5.4 of this Criteria for Smoke Containment Systems Used with <br /> report. Fire-Resistive Elevator Hoistway Doors and Frames <br /> 5.0 CONDITIONS OF USE (AC77), dated October 2003. <br /> 6.3 A quality control manual. <br /> The Smoke Guard® System smoke containment systems <br /> described in this report comply with, or are suitable 7.0 IDENTIFICATION <br /> alternatives to what is specified in, those codes specifically The Smoke Guard®System units described in this report shall <br /> listed in Section 1.0 of this report, subject to the following bear a label indicating the manufacturer's name (Smoke <br /> conditions: Guard® Corporation) and/or trademark, manufacturer's <br /> 5.1 Installation shall comply with this report,Smoke Guard address, product name, model number, leakage rating, the <br /> Corporation's published installation instructions,and the report number(ESR-1136), and the name of the inspection <br /> applicable code. agency(Omega Point Laboratories, Inc.). <br />