My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-010736 - new septic
Orono
>
Property Files
>
Street Address
>
W
>
Watertown Road
>
4705 Watertown Road - 31-118-23-22-0003
>
Septic
>
1998-010736 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:29:40 PM
Creation date
12/23/2019 11:18:18 AM
Metadata
Fields
Template:
x Address Old
House Number
4705
Street Name
Watertown
Street Type
Road
Address
4705 Watertown Road
Document Type
Septic
PIN
3111823220003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. DOWNSLOPE BERM WIDTH Slope:_ Cover r <br /> 1. If landslope is 1% or more, <br /> subtract rock layer width from adsorption width 'i«i° •R"le• <br /> to obtain minimum downslope berm toe Clean sand `'' <br /> 6"Topsoil <br /> w ft- /o ft = /0 feet Natural Soil <br /> 2. Calculate Minimum mound Size <br /> a. Determine depth of clean sand fill at Upaiope Width Downslope Width <br /> upslope edge of rock layer: T Rock Width Absorption Width <br /> Separation 3' - ;. ft= l feet <br /> b. Add depth of clean sand for separation(2a) <br /> at upslope edge, depth of rock layer (1 foot) to depth of cover <br /> (1 foot) to find the mound height at the upslope edge of rock layer; <br /> I ft + lft + lft = 3 feet 70 <br /> c. Enter table with landslope and upslope berm Ups�ope Width <br /> ratio. Select berm multiplier of 3 \ oa °%;: -•may ? °pac °_o <br /> OWUWthv.0-.osnRock Bed o •idthopLeh d. Multiply berm multiplier by upslope mound -ettlint; n <br /> height to find upslope berm width: •°'° a�q°;o4 p,oan� °�' 'aP°P D°°� <br /> x 3.a\ = w feet <br /> e. Multiply rock layer width by <br /> Downslope Width_ <br /> landslope to determine drop in elevation; Absorption Width /o <br /> /v x %= 100 =feet <br /> f. Add depth of clean sand for slope Total Length 8'U <br /> difference (2e)at downslope edge, to <br /> -the mound height at the upslope edge <br /> of rock layer (2d) to find the downslope height; <br /> 3 ft + .. ft = 3.` feet <br /> g. Enter table with landslope and downslope berm ratio. Select <br /> berm multiplier of S? <br /> h. Multiply berm multiplier by downslope mound height to get BERM SLOPE MULTIPLIERS <br /> downslope berm width: <br /> 3. X 5.;(o = I`) feet Land DOWNSLOPE UPSLOPE <br /> i. Com are the values of ste G.1 /v Slope, berm multipliers for various berm multipliers for various <br /> P P in% berm slope ratios berm slope ratios <br /> and Step G.2h /g <br /> Select the greater of the two values as the 3:1 4:1 5:1 6:1 7:1 3:1 4:1 5:1 6:1 7:1 8:1 <br /> downslope berm width; 1 ct feet 0 3.0 4.0 5.0 6.0 7.0 3.0 4.0 5.0 6.0 7.0 8.0 <br /> j. Total mound width is the sum of 1 3.09 4.17 5.26 6.38 7.53 2.91 3.85 4.76 5.66 6.54 7.41 <br /> upslope berm (G.2d) 2 3.19 4.35 5.56 6.82 8.14 2.83 3.70 4.54 5.36 6.14 6.90 <br /> 3 3.30 4.54 5.88 7.32 8.86 2.75 3.57 4.35 5.08 5.79 6.45 <br /> width plus rock layer width (D.2) 4 3.41 4.76 6.25 7.89 9.72 2.68 3.45 4.17 4.84 5.46 6.06 <br /> plus downslope berm width(G.2i); 5 3.53 5.00 6.67 8.57 10.77 2.61 3.33 4.00 4.62 5.19 5.71 <br /> /0 ft + /6 ft+ i° ft= 3q feet 6 3.66 () 7.14 9.38 12.07 2.54 3.23 3.85 4.41 4.93 5.41 <br /> k. Total mound length is the sum of upslope 7 3.80 5.56 7.69 10.34 13.73 2.48 3.12 3.70 4.23 4.70 5.13 <br /> berm width (G.2d) plus rock layer length (D.3) 8 3.95 5.88 8.33 11.54 15.91 2.42 3.03 3.57 4.05 4.49 4.88 <br /> plus upslope berm width (G.2d); 9 4.11 6.25 9.09 13.04 18.92 2.36 2.94 3.45 3.90 4.30 4.65 <br /> t' /U ft + -ss ft+ /o ft= 70 feet 10 4.29 6.67 10.00 15.00 23.33 2.31 2.86 3.33 3.75 4.12 4.44 <br /> / SD /.5 So 11 4.48 7.14 11.11 17.65 30.43 2.26 2.78 3.23 3.61 3.95 4.26 <br /> 12 4.69 7.69 12.50 21.43 43.75 2.21 2.70 3.12 3.49 3.80 4.08 <br /> Final Dim esions: Note:The product of the multiplier and the height results in the horizontal distance to where the <br /> berm meets the original land slope.Example:Height at upper edge of rock layer i 3.0 feet,rock <br /> layer is 10 feet wide,land slope is 696 and berm slope rano rs 41.Upslope berm width is 3.23 x <br /> p ,3`) X 70 3.0=9.7 ft;height at lower edge of rock layer is 3.0P+10 x 0.6=3.6 ft and downslope berm width <br /> - <br /> I) 1 -gyp is 5.26x3.6-18.9ft. <br />
The URL can be used to link to this page
Your browser does not support the video tag.