My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-010736 - new septic
Orono
>
Property Files
>
Street Address
>
W
>
Watertown Road
>
4705 Watertown Road - 31-118-23-22-0003
>
Septic
>
1998-010736 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:29:40 PM
Creation date
12/23/2019 11:18:18 AM
Metadata
Fields
Template:
x Address Old
House Number
4705
Street Name
Watertown
Street Type
Road
Address
4705 Watertown Road
Document Type
Septic
PIN
3111823220003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' PRESSURE DISTRIBUTION SYSTEM END PERFORATION OF A PERFORATED LATERAL <br /> Gross Cover <br /> 1. Select number of perforated laterals 3 F\a/S/ <br /> ;g; <br /> p, Topsoil ,/ <br /> • Layer of Geotextile Fabric (or tour• <br /> r Loamy Sand Layer 'Inch layer of hay or straw covered <br /> 2. Select perforation spacing = 3 feet. • • • with red rosin paper) <br /> tjjjEer{ wi. Perforation Drilled Horizontally <br /> ;y-: - Into C•p Near Top <br /> 3. Since perforations should not be placed closer than 1 ft. to =,;Plus 1...__ <br /> ' —_—AI Least Ir,D Edge <br /> the edge of the rock layer (see diagram), subtract 2 ft. from ' o FINd R•- N .�:•',,{ of Rock Layer <br /> Perforations <br /> the rock layer length. Clean Sand Layer <br /> BottommooffLocated at <br /> Lateral <br /> ft. = `/I( feet. Original Soil Properly Scarified <br /> Rock layer length Before Placing Sand Layer <br /> eqischarge <br /> 4. Determine the number of spaces between perforations. RIn"ired gallons perration minute(gpm) <br /> Divide the length above by perforation spacing and round Di Head 52,.d,P''' d P'.I <br /> down to nearest whole number. (feet) <br /> 1.0a 0.56 0.74 <br /> Length perf. spacing = 'I ft. T 3 ft. _ /6 spaces 2.Ob 0.80 1.04 <br /> (3) (2) a.Use for single family homes <br /> b.Use for all other applications <br /> 5. Number of perforations is equal to one plus the number of <br /> perforation spaces . <br /> Maximum number of quarter inch perforations per <br /> /> spaces + 1 = r? perforations/lateral lateral to guamantee<10%discharge variation <br /> Perforation <br /> 6. Multiply perforations per lateral by number of laterals to S)fee <br /> acing 1% Pi 2 <br /> get total number of perforations. 2.5 14 18 28 <br /> 3 x —�— _ -� perforations. 3.0 13 17 26 <br /> laterals perfs/lateral p 3.3 12 16 25 <br /> 7. Determine required flow rate by multiplying 4.0 11 15 23 <br /> number of perforations by flow per perforation 5.0 10 14 22 <br /> 3-1 ,7t.", . 38,= <br /> gpmQQ e� <br /> perfs x gpm/perf . MANIFOLD LOCATED AT ENO OF PRESSURE DISTRIBUTION SYSTEM <br /> 8. If laterals are connected to header pipe as shown on upper <br /> example, to select minimum required lateral diameter;enter = j" <br /> table with perforation spacing and number of perforations - .,r.�°`° ` <br /> per lateral. Select minimum diameter for ��/`"`M <br /> perforated lateral= I %y inches. <br /> LAYOUT OF PERFORATED PIPE LATERALS FOR <br /> PRESSURE DISTRIBUTION IN UOINID <br /> ct [KOMiS PLASTIC.R <br /> rEl�OrriWe iso,a.' pM <br /> 9. If perforated lateral system is attached to manifold pipe near ofr'"'` I. x K...,,,:,,pe,. .r.• <br /> the center, lower diagram,perforated lateral length and <br /> - Sr- --rorty,;,--- ,...,,,:,,pe,. ,, <br /> number of perforations per lateral will be approximately one - • l, .a..-,z <br /> half of that in step 8. Using these values,select minimum two a, b, <br /> diameter for perforated lateral = I%.--/ inches. ,(ee °`°rte �,. . <br /> ``REM <br />
The URL can be used to link to this page
Your browser does not support the video tag.