Laserfiche WebLink
Amount of materials needed: <br /> Sand---- 180 yds. --- 250 tons Avg. Depth---- 1.6 $ <br /> Rock---- 15 yds. 21 tons PO <br /> " -- 1.0 ft. <br /> Sandy Loam----30 yds. " :" --- 1.0 ft <br /> Topsoil 100 yds. " " --- 9-12 inches. <br /> These amounts could vary by plus or minus 10 '%. <br /> This mound must be pressurized therefore a pump tank and a pump is needed; <br /> Size of pump tank---- 1000 gallons /Q,j 1r4- <br /> Size of Pump --- 30 g.p.m. must overcome -- +2.3 $. of head pressure. <br /> Pumping Rate --- 126 gallons per cycle (4 cycles per day) <br /> *An alarm system must be installed in the house to indicate pump failure. This must be both a <br /> sound and a light alarm system. <br /> Two 1000 gallon sealed septic tanks should be installed,these tanks should be pumped out every <br /> 2-3 years.. <br /> All construction traffic must be kept off both sites to avoid compaction of the soil which will result <br /> in ruining the sites. Therefore both sites should be roped offby the owner or the builder. <br /> Therefore it is very important to stay off this proposed site and the alternate site. <br /> Site Evaluator <br /> 6-40, <br /> Robert A. Koch M.P.C.A. 193/ 1429 <br />