My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-23-2015 Council Work Session Packet
Orono
>
City Council
>
2015
>
11-23-2015 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2019 1:50:12 PM
Creation date
11/21/2019 1:46:57 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
In order to maximize the life of the City's pavements, it is recommended that the City continue to seal <br />coat the streets on a regular basis (every 3 to 7 years). <br />Mill and Overl <br />A mill and overlay consists of removing all or a portion of the in place bituminous surface and placing <br />an application of a plant -mixed surface over the remaining surface. This rehabilitation method is <br />typically used 1-2 times throughout the life of a pavement. Mill and overlays are most effective on <br />pavements that are in moderate condition and with a stable subgrade. This method is used to replace <br />the pavement surface and to increase or restore the pavement's structural integrity. The useful life of a <br />mill and overlay is generally 7 to 10 -years depending upon the condition of the pavement to which it is <br />applied. <br />The advantages of a mill and overlay are as follows: <br />• Moderate initial capital expense <br />• Provides new pavement surface <br />• Increases or restores structural integrity of the pavement <br />• Minimal disruption to traffic <br />• Does not raise the elevation of the street <br />The disadvantages of a mill and overlay include the following: <br />• Requires patching and repair of weak subgrade areas prior to application <br />• Increased cost compared to an overlay with no milling <br />Limited effectiveness on pavements in poor condition <br />* <br />Useful life is variable depending upon the condition of the existing pavement <br />• Ineffective on pavements with structurally limited subgrades <br />Reconstruction <br />Reconstruction consists of removal of the entire existing pavement section and the construction of a <br />new pavement structure, including bituminous, aggregate base, geotextile fabric, soil correction, etc. <br />This method is used when the existing pavement has deteriorated to such an extent that other <br />rehabilitation methods are ineffective or utility construction is necessary. The useful life of a <br />reconstructed pavement can be 25 to 30 years with proper maintenance and use of other rehabilitation <br />methods throughout the pavement's life. <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.