My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-P12228 (00020) - new septic
Orono
>
Property Files
>
Street Address
>
W
>
Watertown Road
>
3940 Watertown Road - 32-118-23-32-0001
>
Septic
>
2008-P12228 (00020) - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:40:30 PM
Creation date
11/4/2019 1:48:52 PM
Metadata
Fields
Template:
x Address Old
House Number
3940
Street Name
Watertown
Street Type
Road
Address
3940 Watertown Road
Document Type
Septic
PIN
3211823320001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. MOUND SLOPE WIDTH & LENGTH Landslope > 1% slope <br /> (landslope greater than 1%) <br /> overl <br /> 1. Downslope absorption width = absorption width (F) OP o <br /> 9�: b4�o oo ed t <br /> minus rock layer width (D2) 6"Topsoil <br /> / Clean Sand l bl}ft <br /> 1 ft- ! 0 ft - ) / ft Separation ft <br /> Restricting Layer <br /> Upslo idth(G2d) Rock 4)r'dth(D2) Do- 1d1h(G2i) <br /> 2. Calculate mound size _ _It - h <br /> UPSLOPE <br /> a. Depth of clean sand fill at upslope edge of L <br /> Absorption Width-Sand(F) <br /> rock layer = 3 ft minus the distance to restricting layer (Cl) 37 <br /> 3 ft- 2'•r ft = I.0 ft <br /> b. Mound height at the upslope edge of rock D-34: SLOPE MULTIPLIER TABLE <br /> layer = depth of clean sand for separation (G2a) LanaUPSLOPE DOWNSLOPE <br /> Slope multipliers for various multiptiers for various <br /> at upslope edge plus depth of rock layer (1 ft) in! slope ratios slope ratios <br /> plus depth of cover (1 ft) 3:1 4:1 5:1 6:1 7:1 8:1 3:1 4:1 5:1 6:1 7:1 <br /> W ft + Ift + Ift = .13+0 ft 0 3.0 4.0 5.0 6.0 7.0 8.0 3.0 4.0 5.0 6.0 7.0 <br /> C. Upslope berm multiplier based on land slope 1 2.91 3.85 4.76 5.66 6.54 7.41 3.09 4.17 5.26 6.38 7.53 <br /> y^� -, (see figure D-34) 2 2.83 3.70 4.54 5.36 6.14 6.90 3.19 4.35 5.56 6.82 8.14 <br /> d. Upslope width = berm multiplier (G2c) times 3 2.75 3.57 4.35 5.08 5.79 6.45 3.30 4.54 5.88 7.32 8.86 <br /> upslope mound height (G2b): 4 2.68 3.45 4.17 4.84 5.46 6.06 3.41 4.76 6.25 7.89 9.72 <br /> X ? J f t = 4� f t 5 2.61 .33 4.00 4.62 5.19 5.71 3.53 `jJ00 6.67 8.57 10.77 <br /> 6 2.54 3.23 3.85 4.41 4.93 5.41 3.66 5.26 7.14 9.38 12.07 <br /> DOWNSLOPE 7 2.48 3.12 3.70 4.23 4.70 5.13 3.80 5.56 7.69 10.34 13.73 <br /> e. Drop in elevation = rock layer width (D2) times 8 2.42 3.03 3.57 4.05 4.49 4.88 3.95 5.88 8.33 11.54 15.91 <br /> percent landslope (C5) = 100 9 2.36 2.94 3.45 3.90 4.30 4.65 4.11 6.25 9.09 13.04 18.92 <br /> 0 ft X '/ %- 100 = ,�S' ft 10 2.31 2.86 3.33 3.75 4.12 4.44 4.29 6.67 10.00 15.00 23.33 <br /> f. Downslope mound height= depth of clean 11 2.26 2.78 3.23 3.61 3.95 4.26 4.48 7.14 11.11 17.65 30.47 <br /> sand for slope difference (G2e) at downslope 12 2'21 2.70 3.12 3.49 3.80 4.08 4.69 7.69 12.50 21.43 43.75 <br /> rock edge plus the mound height at the <br /> upslope edge of rock layer (G2b) <br /> Z'0 ft + ,'5- ft = 7s'3 ft <br /> g. Downslope berm multiplier based on percent land slop <br /> .�L? (see figure D-34) 1t " q, <br /> h. Downslope width = downslope multiplier = 101 <br /> r') i \ , <br /> 1 <br /> (G2g) times downslope mound height (G2f) L13I Upslope Wid th(G2t <br /> ft <br /> In <br /> X ,, ft = �':� ft � Upslope Width(G2d)(� '��•I 'Ro,kWidtBed (a f ,0� Upslope Width(G2d)- <br /> i. Select the greater of G1 and G2h as the Length(D3) <br /> �,ctis C�asy, <br /> downslope width: 14� ft Fo Downslope Width(G2i) .Z'y ft <br /> j. Total mound width is the sum of upslope Absorptiln WidthcF>�2 <br /> width (G2d) width plus rock layer width <br /> (D2) plus downslope width (G2i) _ ti')t - Total Length(G2k) ft <br /> )"") ft + /() ft+ a-1) ft = Li ft <br /> k. Total mound length is the sum of upslope width (G2d) <br /> plus rock layer length (D3) plus upslope width (G2d) <br /> 10 ft + L,.z ft + 10 ft = <br /> F1nd1 Dimensions: <br /> `f 3 \AJ x y 1 1 \_ <br /> I hereby certify that I have completed this work in accordance with applicable ordinances, rules and laws. <br /> (signature) ` f (license#) (date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.