Laserfiche WebLink
AGENDA ITEM <br /> <br />Prepared By: Reviewed By: DJR Approved By: DJR <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1. Purpose. The purpose of this council action is to award the Bederwood Sports field project. <br /> <br />2. Background. The Orono Parks Commission is seeking to provide a sports field at Bederwood Park as <br />well as expanding and paving the parking lot. The intent of the project is to provide a facility to support <br />youth sports efforts in the area. To help offset the cost of the project the city submitted a grant <br />application to the Hennepin County youth sports grant program for $211,550 and was approved for <br />$136,275. Staff worked to reduce the scope of the project from the original submission to fit within the <br />budget. The design has been completed. The main portion of the project was awarded in August. This <br />council action if for the well that is required for the irrigation of the sports field. <br /> <br />3. Project Scope. The project scope is a turf sports field, paved parking lot, well and irrigation system. <br />This council action is focused on the well component of the project and includes both the construction of <br />the new well and the sealing of the old well. <br /> <br />4. Cost. The City received 4 quotes. The Quote Summary is at Exhibit A. The recommended low <br />quote is for $45,863 from T.L Stevens Well Company. <br />Who Work Cost Status <br />Bolton &Menk, Inc Design and Engineering $ 37,500 Not to exceed, Previously approved <br />Sunram Construction Construction $ 322,782 Previously awarded. <br />TBD New Well $45,863 Pending approval. <br />Bolton &Menk, Inc Construction Oversight $ 39,000 Not to exceed, Previously approved <br />Total $ 445,145 <br /> <br />5. Funding. Funding for the City cost share, $ 308,870, for the project would come from the Parks <br />Fund. The Hennepin county Grant is for $136,275. The Park Fund projected 2019 end of year balance is <br />$329,197. <br /> <br />6. Staff Recommendation. Staff recommends acceptance of the quote from T.L. Stevens Well <br />Company. This quote is the second lowest however includes a variable flow pump which eliminated the <br />need for a pressure/ storage tank within the system. The lowest quote did not include excavation and <br />electrical for pump and tank installation. <br /> <br />7. Time Line. <br />Dates Activity <br />September –October 2019 Construct <br />June 2020 Field playable <br /> <br />COUNCIL ACTION REQUESTED <br />Motion to Award the Bederwood Sports Field project to Sunram Construction for $ 322,782 and to <br />authorize Bolton and Menk to perform construction oversite for a fee not to exceed $ 39,000. <br /> <br />Exhibits <br />A. Quote Summary <br />Item No.: 8 Date: September 9, 2019 <br />Item Description: Bederwood Sports Field Well Award <br />Presenter: Adam T. Edwards <br />Public Works Director/City Engineer <br />Agenda <br />Section: <br />Consent Agenda