My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-010305 - new septic
Orono
>
Property Files
>
Street Address
>
W
>
Watertown Road
>
3580 Watertown Road - 32-118-23-43-0003
>
Septic
>
1998-010305 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:41:29 PM
Creation date
10/21/2019 11:38:53 AM
Metadata
Fields
Template:
x Address Old
House Number
3580
Street Name
Watertown
Street Type
Road
Address
3580 Watertown Road
Document Type
Septic
PIN
3211823430003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUMP SELECTION PROM <br /> A. Determine pump capacity: <br /> Gravity Distribution <br /> 1. Minimum suggested is 20 gpm <br /> 2... Maximum suggested is 45 gpm <br /> Pressure Distibution <br /> 3.a. Select number of perforated laterals 3 Perforation Discharges in GPM <br /> b. Select perforation spacing= 3 feet. Head Perforation diameter <br /> C. Subtract 2 ft.from the rock layer length. feet inches <br /> ,-,Z> -2 ft._ `7 feet. 7/32 1/4 <br /> Rods layer length <br /> d. Determine the number of spaces between perforations. 1.0a 056 0.74 <br /> Length perf.spacing= 11 1K ft.+ '3 1 ft._ /(- spaces 1.5 0.69 0.90 <br /> e. 16 spaces+1 =7 perforationsAateral 2.ob 0.80 1.04 <br /> f. Multiply perforations per lateral by-number of laterals to a Use 1.0 foot single homes. <br /> get total number of perforations. s x __ss'_perforations. b Use 2.0 feet for anything else. <br /> g• x fi ` _ "& gpm. <br /> SELECTED PUMP CAPACITY 36' gpm <br /> B.Determine head requirements: Soil treatment system <br /> 1. Elevation difference between pump and point of discharge. <br /> 8 <br /> feet Total pipe length <br /> 2. If pumping to a pressure distribution system,five feet for pressure <br /> required at manifold if gravity system,zero. <br /> S feet Elevation Difference <br /> t <br /> 3. Friction loss .______ <br /> a. Enter friction loss table with gpm and pipe diameter. •••••••••••••••• ------------------------------------- <br /> Read <br /> __. _ _ __________ <br /> Read friction loss in feet per 100 feet from table(F-14). <br /> F.L._ ;Z.G L/ ft./100 ft of pipe <br /> b. Determine total pipe length from pump to discharge Friction Loss in Plastic Pipe <br /> point. Estimate by adding 25 percent to pipe length for fitting Nominal <br /> loss,or use a fitting loss chart(F-15_feet). pipe dia. <br /> Equivalent pipe length-1.25 times pipe length= Flow Rate <br /> 30, x i.25= 3S feet gpm 1.5" 2„ 3" <br /> c. Calculate total friction loss by multiplying <br /> friction loss in ft/100 ft by equivalent pipe length. 20 2.47 0.73 0.11 <br /> Total friction loss= 3$ x a'�N +100=_I feet 25 3.73 1.11 0.16 <br /> 4. Total head required is the sum of elevation difference, 30 5.23 1.55 0.23 <br /> 35 6.96 2A 0.30 <br /> special head requirements,and total friction loss. 40 8.912.64 0.39 <br /> + + 50 13.46 3.99 058 <br /> (1) (2) (3c) 55 4.76 0.70 <br /> 60 5.60 0.82 <br /> 65 6.48 0.95 <br /> TOTAL DEAD H flet 1 70 1 7.44 1.09 <br /> C. Pump selection <br /> 1. A pump must be selected to'deliver at least <br /> 31� gpm (Step A)with at least 1 y fit of tdW head(Step B). <br />
The URL can be used to link to this page
Your browser does not support the video tag.