My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-11-2014 Revised 07-24-12 Soil & Percolation Testing
Orono
>
Property Files
>
Street Address
>
P
>
Pine View Drive
>
1125 Pine View Drive - 28-118-23-42-0007
>
Septic
>
11-11-2014 Revised 07-24-12 Soil & Percolation Testing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:25:29 PM
Creation date
10/16/2019 10:34:58 AM
Metadata
Fields
Template:
x Address Old
House Number
1125
Street Name
Pine View
Street Type
Drive
Address
1125 Pine View Drive
Document Type
Septic
PIN
2811823420007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
( OSTP Pressure Distribution� UNIVERSITY <br /> Minnesota Pollution Design Worksheet OF MINNESOTA <br /> Control Agency '�.. <br /> Project ID: v 11.09.22 <br /> 1. Select Number of Perforated Laterals in system/zone: 3 <br /> (2 feet is minimum and 3 feet is maximum spacing) <br /> )2 ` t2 Solt <br /> 2. Select Perforation Spacing: 3.0 ft a <br /> M t e t ` <br /> I. fnrations pared3'apan I"2 of rock. / it" <br /> 3. Select Perforation Diameter Size 7/32 in - - <br /> 'Ti '/ <br /> I6"of rock <br /> 4. Length of Laterals =Media Bed Length-2 Feet. Perforation sizing,'I to'/." Perforatron spacing;2'to 3' <br /> 63 - 2ft = 61 ft Perforation can not be closer then 1 foot from edge. <br /> 5- Determine the Number of Perforation Spaces. Divide the Length of Laterals (Line 4)by the Perforation Spacing (Line 2)and <br /> round down to the nearest whole number. <br /> Number of Perforation Spaces = 61 ft - 3 ft = 20 Spaces <br /> 6. Number of Perforations per Lateral is equal to 1.0 plus the Number of Perforation Spaces (Line 5). <br /> Perforations Per Lateral = 20 Spaces + 1 = 21 Perfs. Per Lateral <br /> Check table below to verify the number of perforations per lateral guarantees less than a 10%discharge variation. The value is <br /> double if the a center manifold is used. <br /> Maximum Number of Perforations Per Lateral to Guarantee<1016 Discharge Variation <br /> 1f4 Inch Perforations 7/32 Inch Perforations <br /> Perforation Spacing(Feet) Pipe Diameter(Inches) Perforation Spacing Pipe Diameter(inches) <br /> I <br /> 11.4 11/2 2 3 (Feet) 1 114 1/2 2 3 <br /> 2 10 13 18 30 60 2 11 16 21 34 68 <br /> 211 8 12 16 28 54 21 10 14 20 32 64 <br /> 3 8 12 l 16 25 52 3 9 14 19 30 60 <br /> 3/16 inch Perforatioru 1/8 Inch Perforations <br /> Pipe Diameter(Inches) Perforation Spacing Pipe Diameter(Inches) <br /> Perforation Spacing(Feet) <br /> 1 11 12 2 3 (Feet) 1 1/ 11 2 3 <br /> 2 12 18 26 46 87 2 21 33 44 74 149 <br /> 211 12 17 24 40 80 21 10 30 41 69 135 <br /> 3 12 16 22 37 75 3 20 29 38 64 128 <br /> 7. Total Number of Perforations equals the Number of Perforations per Lateral (Line 6)multiplied by the Number of <br /> Perforated Laterals (Line 1). <br /> 21 Perf. Per Lateral X 3 Number of Perf. Laterals = 63 Total Number of Perf. <br /> 8. Calculate the Square Feet per Perforation. Recommended value is 4-10 ft2 per perforation. Perforation Discharge(GPM) <br /> Does not apply to At-Grades Perforation Diameter <br /> Head(ft) Ira she rht ' <br /> Bed Area = Bed Width(ft)X Bed Length(ft) ,.o' ate 0.41 0.56 0.74 <br /> 1.5 0.22 0.51 0.69 0.9 <br /> 10 ft x 63 ft = 630 ft2 2.0^, 0.26 0.59 0.80 4.04 <br /> 2.5 0.29 0.65 0.89 1.17 <br /> Square Foot per Perforation =Bed Area divided by the Total Number of Perforations (Line 7). 4.0 0.37 1 <br /> 0.83 1.12 0 72 3 1.47 <br /> 5.0' ;:0.41 ,.:.0.93 1.26 1.65 <br /> 630 ft2 63 perforations Dwelling.with 3/16 inch to 1/4 Inch <br /> 10.0 ft2/perforations 'foot perforations <br /> Dwellings with 1/8 inch perforations <br /> 2 feet Other establishments and MSTS with 3/16 <br /> 9. Select Minimum Average Head: 1.0 ft inch to 1/4 inch perforations <br /> 5 feet Other establishments and M5T5 with 178 inch <br /> perforatknc <br /> 10. Select Perforation Discharge (GPM)based on Table III: 0.56 GPM per Perforation <br /> 11. Determine required Flow Rate by multiplying the Total Number of Perforations (Line 7)by the Perforation Discharge (Line 10). <br />
The URL can be used to link to this page
Your browser does not support the video tag.