Laserfiche WebLink
Geotexrile fabric <br /> PRESSURE DISTRIBUTION SYSTEM <br /> 1. Select number of perforated laterals _._ >uarto:inch perforations spaced Q 3' 12 <br /> 2. Select perforation spacing = ft I 9"of rock <br /> i <br /> Perf Sizing 3/16" - 1/4" <br /> 3. Since perforations -,hould nt)t be placed closer than lout tc, Perf Spacing 15-5' <br /> the edge of the rock layer (see diagram), subtract 2 tt•t,t from <br /> the rock layer lenbti E-4 Maximum allowable number of 1/4-inch perforations <br /> per iateral to guarantee d 0%discharge variation <br /> Rock Ix—length ft = s'3 ft perforation <br /> spacing j <br /> 4. Determine the number of spaces between perfurati,;,:�. j <br /> Divide the length ( by perforation spacing (2) and ur.� <br /> (faet 1 inch 1.25 inch 1,5 inch 2,0 inch <br /> down to nearest wht le number. <br /> 5 8 14 18 28 <br /> Perforation spacing = .53 ft -,3 ft= / spaces 0 8 13 11 26 <br /> • 5. Number of perforations is equal to one plus the nun;'t)tr of 3 7 12 16 2 <br /> perforation spaces(4). Check rigure E-4 to assure the rli,r�:bcr ul 0 1 11 15 23 <br /> perforations per later,. juaranrcc <10`i,, discharge �t, ::, :i. 6 10 14 22 <br /> space, + 1 = perforations/later.;l E-6: Perforation Discharge in gpm <br /> 6. A. Total number of perforations = perforation, per 111 ceral (5) perforation diameter <br /> times number of laterals (1) head inches <br /> (fe1/8 3/16 7/32 1/4 <br /> perfs/11.t x _--_lat= J peri' <br /> 1.0a 0.18 0.42 0.56 0.74 <br /> B. Calculate the square rootage per perforation. <br /> Should be 6-10 sgrt, perf. Does not apply to at-grades. 2.0b 0.26 '0.59 0.80 1.04 <br /> Rock bed area = rock width (ft) x rock length (ft) 5.0 0.41 0.94 1 .26 1.65 <br /> eft xft = 5S� sgft <br /> Use 1.0 foot for single-fomuv nomas <br /> Square foot per perforation = Rock bed area - num,_,r or perf, (d: b Use 2.0 feet for onvtning else <br /> sgfr =_ perfs =_Z6 sgft. pert <br /> 7. Determine required tow rate by multiplying the tom., iiumber of , <br /> perforations (6A) by ,low per perforation (see fi,,urr D"--110(n <br /> perfs xttf, gpm/perfs ,Cap <br /> 8. If laterals are connected to header pipe as shown un �.pper <br /> example, to select minimum required lateral diamctc':; enter olip eiron <br /> figure E-4 with perforation spacing (2) and number ;-,errorations hyureE l:ManiloldlocatedatEndolSystem <br /> per lateral (5) Select minimum diameter for —_ <br /> perforated lateral = _-- in,Hes. fig.aE•2:Manifold locoied <br /> in re Center of the System <br /> 9. If perforated lateral system is attached to manifc iii pi: near <br /> the center, lower diagram, perforated lateral len,-th („ snd rtOYI�q GL< <br /> number of perforations per lateral (5) will be approxirr,.itely one <br /> half of that in step 8. Using these val us, select min::r..::n <br /> diameter for perforated lateral = 1 �lZ, inches. air <br /> rtify that I have coni eted this work in accorda,.ct- ut-iinanc1es, rules and laws. <br /> _(signature) n r.) 1 ( G y (date) <br />