My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-P08269 - new septic
Orono
>
Property Files
>
Street Address
>
W
>
Watertown Road
>
3520 Watertown Road - 32-118-23-43-0014
>
Septic
>
2004-P08269 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:41:45 PM
Creation date
10/14/2019 1:00:40 PM
Metadata
Fields
Template:
x Address Old
House Number
3520
Street Name
Watertown
Street Type
Road
Address
3520 Watertown Road
Document Type
Septic
PIN
3211823430014
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotexrile fabric <br /> PRESSURE DISTRIBUTION SYSTEM <br /> 1. Select number of perforated laterals _._ >uarto:inch perforations spaced Q 3' 12 <br /> 2. Select perforation spacing = ft I 9"of rock <br /> i <br /> Perf Sizing 3/16" - 1/4" <br /> 3. Since perforations -,hould nt)t be placed closer than lout tc, Perf Spacing 15-5' <br /> the edge of the rock layer (see diagram), subtract 2 tt•t,t from <br /> the rock layer lenbti E-4 Maximum allowable number of 1/4-inch perforations <br /> per iateral to guarantee d 0%discharge variation <br /> Rock Ix—length ft = s'3 ft perforation <br /> spacing j <br /> 4. Determine the number of spaces between perfurati,;,:�. j <br /> Divide the length ( by perforation spacing (2) and ur.� <br /> (faet 1 inch 1.25 inch 1,5 inch 2,0 inch <br /> down to nearest wht le number. <br /> 5 8 14 18 28 <br /> Perforation spacing = .53 ft -,3 ft= / spaces 0 8 13 11 26 <br /> • 5. Number of perforations is equal to one plus the nun;'t)tr of 3 7 12 16 2 <br /> perforation spaces(4). Check rigure E-4 to assure the rli,r�:bcr ul 0 1 11 15 23 <br /> perforations per later,. juaranrcc <10`i,, discharge �t, ::, :i. 6 10 14 22 <br /> space, + 1 = perforations/later.;l E-6: Perforation Discharge in gpm <br /> 6. A. Total number of perforations = perforation, per 111 ceral (5) perforation diameter <br /> times number of laterals (1) head inches <br /> (fe1/8 3/16 7/32 1/4 <br /> perfs/11.t x _--_lat= J peri' <br /> 1.0a 0.18 0.42 0.56 0.74 <br /> B. Calculate the square rootage per perforation. <br /> Should be 6-10 sgrt, perf. Does not apply to at-grades. 2.0b 0.26 '0.59 0.80 1.04 <br /> Rock bed area = rock width (ft) x rock length (ft) 5.0 0.41 0.94 1 .26 1.65 <br /> eft xft = 5S� sgft <br /> Use 1.0 foot for single-fomuv nomas <br /> Square foot per perforation = Rock bed area - num,_,r or perf, (d: b Use 2.0 feet for onvtning else <br /> sgfr =_ perfs =_Z6 sgft. pert <br /> 7. Determine required tow rate by multiplying the tom., iiumber of , <br /> perforations (6A) by ,low per perforation (see fi,,urr D"--110(n <br /> perfs xttf, gpm/perfs ,Cap <br /> 8. If laterals are connected to header pipe as shown un �.pper <br /> example, to select minimum required lateral diamctc':; enter olip eiron <br /> figure E-4 with perforation spacing (2) and number ;-,errorations hyureE l:ManiloldlocatedatEndolSystem <br /> per lateral (5) Select minimum diameter for —_ <br /> perforated lateral = _-- in,Hes. fig.aE•2:Manifold locoied <br /> in re Center of the System <br /> 9. If perforated lateral system is attached to manifc iii pi: near <br /> the center, lower diagram, perforated lateral len,-th („ snd rtOYI�q GL< <br /> number of perforations per lateral (5) will be approxirr,.itely one <br /> half of that in step 8. Using these val us, select min::r..::n <br /> diameter for perforated lateral = 1 �lZ, inches. air <br /> rtify that I have coni eted this work in accorda,.ct- ut-iinanc1es, rules and laws. <br /> _(signature) n r.) 1 ( G y (date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.