My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
waterproofing/insulation/backfill inspection
Orono
>
Property Files
>
Street Address
>
W
>
Watertown Road
>
3465 Watertown Road - 32-118-23-43-0008
>
Correspondence
>
waterproofing/insulation/backfill inspection
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:41:37 PM
Creation date
10/14/2019 10:40:52 AM
Metadata
Fields
Template:
x Address Old
House Number
3465
Street Name
Watertown
Street Type
Road
Address
3465 Watertown Road
Document Type
Correspondence
PIN
3211823430008
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<ioe@cordon-iames.com> <br /> Subject: Foundation inspection 3465 Watertown RD <br /> Roger, I was called this morning from Christine stating that the foundation/insulation inspection could not take place <br /> until the as-built survey was done.She mentioned that it was on the checklist we received with the permit. My question <br /> is not whether it is a requirement to inspect these-my questions are of safety and timing of the inspection as it relates <br /> to the as built survey. <br /> 1) By requiring an as-built before back fill you are requiring the surveyors to walk on 10'walls to mark the positions <br /> for the survey.Or worse—when doing a sport court, a 20' wall.That is extremely unsafe. I do not see why the <br /> foundation/insulation and waterproofing inspection cannot take place before backfill,then back fill,then the <br /> as-build can be done safely. <br /> 2) Due to the ever-changing weather here the timing between insulation and waterproofing is critical.We cannot <br /> leave a foundation open to the weather for days while we wait for a surveyor to do his work and an inspector to <br /> do his work.This could take days and puts the integrity of the foundation in jeopardy. <br /> I am not sure origin of these requirements but I STRONGLY request that the sequence of these steps be reordered in the <br /> name of safety and construction integrity. Let me know if I am miss—understanding something here. <br /> Regards, <br /> Will Haack <br /> Director of Residential Construction <br /> Cordon <br /> llamas <br /> E+a«-w-wrnx usa+.wr <br /> Direct:612-889-3247 <br /> Office:763-479-3117 <br /> Email:willCa)gordon james.com <br /> MN Lic:BC531961 <br /> PO Box 3o6 <br /> 5159 Highway 12 Suite 200 <br /> Maple Plain, Minnesota 55359 <br /> The information contained in this electronic mail message is confidential information intended only for the use of the individual or entity named <br /> above,and may be privileged.If the reader of this message is not the intended recipient or the employee or agent responsible to deliver it to the <br /> intended recipient you are hereby notified that any dissemination,distribution or copying of this communication is strictly prohibited. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.