Laserfiche WebLink
23i 0.45 gpd/ft2 Absorption area Soil Loading Rate, which gives a mound ratio of 2.7 (minimum) <br /> (this must match the soil boring log) desired mound ratio 2.7 <br /> 24) percent site slope (0-20% range) F-5 ](%downslope site slope, if different than upstope) <br /> s) 18 inches, or =ft. to Redox or other limiting condition (need at least 12"to be a Type 1) <br /> Treatment zone contains inches of 0%soil credit, and =inches of 50%soil credit. Giving a: <br /> 26) 18 inch, or =ft. Sand Lift Mound CRITICAL FOR FUTURE CERTIFICATIONS IN <br /> 27) 27.0 ft.Total ABSORPTION width (with sand beyond rockbed as follows:) <br /> 16) 0.0 ft. upstope and sidestope <br /> 17.0 ft. Downslope <br /> Individual slope ratios give BERM widths (topsoit beyond rockbed)of: <br /> 29) 4:1 upstope ratio12 ft. upstope berm <br /> 30 4:1 sideslope 16 ft. sideslope berms <br /> )i 4:1 downslope 21 ft. downslope berm <br /> 32) Overall Dimensions: 10.0 ft. wide by 63.0 ft. long Rock bed <br /> 43 ft. wide by 95 ft. long Mound footprint <br /> 4" inspection pipe <br /> 18" cover on top <br /> U slope berm ='I Downslope berm 21 <br /> 12" cover on sides <br /> (6"loamy cap&6"topsoil) <br /> 1.5 dean sand lift <br /> 1.5 Depth to Limitiog <br /> ILI Absorption Width 27.0 <br /> Note: <br /> For 0 to t%slopes, Absorption Width is measured from the Bedequally in both directions. <br /> For slopes >1%, Absorption Width is measured downhill from the upslope edge of the Bed. <br /> 33) Rock Bed: <br /> 10.0 ft. by 63.0 ft. by inches under pipe, plus 20%gives21 yd'or"1.4= 29 ton <br /> 34) Mound Sand: (note: volume is based on 3:1/4:1 slope from top of rockbed, Exchange sand for loamy cap if desired) <br /> 33.5 up + 72.5 downslope + 13.3 ends+ 40.8 under rock= 192 yd'or`1.4= 269 ton <br /> plus 20% <br /> ;;, Loamy Cap: <br /> 39 ft. by 9t ft. 6"deep, plus 20%gives 79 yd'or`1.4= 1-1 17 ton <br /> 36) Topsoil: <br /> 43 ft. by 95 ft. 6"deep, plus 20%gives 91 yd'or"1.4= 127 ton <br /> I hereby certify that I have completed this work in accordance with all applicable ordinances, rules and laws. <br /> Rusty olson's Soil Et Perc 810 7/7/2017 <br /> finer Signature Company License# Date <br />