My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sewer Water Connection Memo_Gaffron
Orono
>
Property Files
>
Street Address
>
B
>
Brown Road South
>
130 Brown Road South - PID: 03-117-23-12-0010
>
Land Use
>
Sewer Water Connection Memo_Gaffron
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:33:05 PM
Creation date
9/26/2019 9:51:37 AM
Metadata
Fields
Template:
x Address Old
House Number
130
Street Name
Brown
Street Type
Road
Street Direction
South
Address
130 Brown Rd S
Document Type
Land Use
PIN
0311723120010
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dunn & McCuskey S&W Charges Analysis <br /> April 13,2009 <br /> Page 4 <br /> Possible Dunn Ezpectations. There is potentiall}� an eapectation by Dunn that no City of <br /> Orono connection fee will be due for her connections. Remember that Lazniarz had to <br /> purchase an easement from Dunn for access to the Creekside Development over a portion of <br /> Dunn's property (Tract G, RLS 352). In correspondence between MPG and Dunn's attorney <br /> Jeremy Steiner in 2004, Steiner asked that the Developers Agreement include language <br /> stating that 1) two sewer and water stubs will be installed along Dunn's lot line and that 2) <br /> Dunn will not be assessed for City water and sewer. My response was: <br /> L The preliminary plat approval resolution acknowiedges WDD's (FIenry Lazniarz's) <br /> intent to provide sewer and water service to the Dunn property, but does not require <br /> that WDD provide such service. Assuming that WDD agrees to `the installation of two <br /> water and rivo sewer service stubs to serve the Dunn property' becoming a requirement, <br /> the Citv will not object to this being added as a condition of the Developer's Agreement. <br /> 2. In terms of assessment for the installation, the City of Orono will require that WDD <br /> bears the entire cost of construction of all improvements including sewer, water, road <br /> and utilities. WDD will upon acceptance by the Cit��, turn over the sewer and water <br /> facilities to the City of Orono, and they will become part of the Orono utility system, to <br /> be operated by Orono. <br /> However, we are assuming that the City of Long Lake will charge WDD (or will etcarge <br /> Orono) some form of `per unit connection charge' for the privilege of connecting into <br /> the Long Lake sewer and water systems. Our expectation, pending completion of a <br /> formal agreement between the two cities, is that WDD will pay Long Lake directly for <br /> the connection charges for his seven units, but I have no knowledge of whether he will <br /> pay the connection charge(s) for Dunn. I dou't know when Dunn will make use of the <br /> two units. I don't know whether Long Lake will expect up-front payment of a <br /> connection charge for all potential units (we think that there might be as many as ll <br /> total units over the long term,including WDD's seven,Dunn's two,and one each for the <br /> properties at 130 and 140 Brown Road), or whether Long Lake will only collect now for <br /> the 7 initial units and collect for future units as thev are connected. And I don't know <br /> whether Long Lake would bill those in the future to the individual users or would <br /> expect that Orono pay whatever connection charge is due (in which case Orono would <br /> bill or assess this to the individual property being connected at that time). <br /> It is clear that all the connection charge issues must be understood and conclusions <br /> reached before the Developer's Agreement is finalized. Greg Gappa, Orono's Director <br /> of Public Services, is working with Long Lake to finalize a sewer and water agreement. <br /> tintil the connection charge issue is resolved, I do not believe Orono can commit that <br /> "the Dunn property will not be assessed for the City water and sanitary sewer <br /> improvements for the Creekside in Orono development". However, if you conclude <br /> that `installation of the improvements' is a separate issue from `assessment for any <br /> connection charges that Long Lake may impose on Dunn or the City of Orono', then I <br /> believe we can craft language that gives you the desired confirmation. <br /> Language clarifying the assessment issues ultimately was not included in the Developers <br /> Agreement. The Final Plat Resolution conditions as well as the Developers Agreement <br /> contain only the following with regard to sewer and water s��stems: <br />
The URL can be used to link to this page
Your browser does not support the video tag.