My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-28-2019 Council Packet
Orono
>
City Council
>
2019
>
05-28-2019 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2019 9:50:39 AM
Creation date
9/24/2019 9:49:04 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
JOINT POWERS AGREEMENT <br />BETWEEN THE CITY PLYMOUTH AND THE <br />CITY OF ORONO FOR THE <br />MILL AND OVERLAY OF FERNDALE LANE FROM COUNTY ROAD 6 TO HIGHWAY 12 <br />THIS AGREEMENT is entered into between the CITY OF PLYMOUTH, a Minnesota municipal <br />corporation (hereinafter referred to as "Plymouth") and the CITY OF ORONO, a Minnesota municipal <br />corporation (hereinafter referred to as "Orono"), with the parties collectively hereinafter referred to as the <br />"Cities". <br />WHEREAS, the Cities desire to implement the mill and overlay of Ferndale Lane between County <br />Road 6 and Highway 12 in the cities (the "Project"); and <br />WHEREAS, Minn. Stat. § 471.59 authorizes two or more governmental units to enter into agreements <br />to jointly or cooperatively exercise any power common to the contracting parties or any similar power; and <br />WHEREAS, Plymouth will prepare the plans and specifications for the Project (the "Plans"). <br />NOW, THEREFORE, in consideration of their mutual covenants the parties agree as follows: <br />1. PLANS AND SPECIFICATIONS. Plymouth will prepare plans and specifications for the <br />Project consistent with Plymouth and Orono design standards. After final design of the project has been <br />completed Plymouth shall provide Orono with the Plans and an estimate of cost detailing the expected <br />responsibility of each party. <br />2. BIDDING. Plymouth will advertise for bids for the construction of the Project in <br />accordance with Minnesota law and will provide Orono with an analysis of the bids received. Plymouth <br />may reject the bids. If Plymouth rejects the bids, Plymouth may terminate this Agreement. Plymouth <br />must obtain Orono's approval of the bid before awarding a contract. <br />3. CONTRACT AWARD. Plymouth shall prepare contract documents and enter into a <br />contract with the approved bidder. <br />4. CONSTRUCTION. Plymouth will provide the construction of the Project in accordance <br />with Minnesota Law and will provide Orono with a summary of the quantities of materials required to <br />construct Orono's portion of the Project. <br />5. COST ALLOCATION. Relevant project costs shall be paid by each Party in accordance <br />with the construction quantity tabulation for items attributable to each Party. Project costs include <br />actual constructions quantities and costs. Project costs also include fees incurred from Plymouth's <br />designated engineer, SRF Consulting Group, Inc. Fees from Plymouth's designated engineer, pursuant to <br />the Agreement for Engineering Services dated December 11th, 2018, shall be split equally between the <br />Cities. Any fees resulting from amendments to the agreement with Plymouth's designated engineer shall <br />be paid as mutually agreed upon by the Cities. Project costs do not include costs associated with the <br />parties' employees. <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.