My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#3415-prelim subd-1994
Orono
>
Property Files
>
Street Address
>
W
>
Watertown Road
>
2645 Watertown Road - 04-117-23-12-0008
>
Resolutions
>
#3415-prelim subd-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:06:47 PM
Creation date
7/22/2019 9:45:47 AM
Metadata
Fields
Template:
x Address Old
House Number
2645
Street Name
Watertown
Street Type
Road
Address
2645 Watertown Rd
Document Type
Resolutions
PIN
0411723120008
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. , i . �, <br /> � ��' CITY of ORONO <br /> O .,� O <br /> • � � ���=� RESOLUTION OF THE CITY COUNCIL <br /> r� ��'.' ,, ,�,� � . <br /> ,� � y a�,�.: ti No. � �. 5 <br /> �z <br /> ti <br /> ��9k o¢�G <br /> E3II <br /> 14. The park dedication fee for the first phase subdivision of $77,351.00 shall be <br /> adjusted to reflect the cost of construction of bike trail on east side of Old Crystal <br /> Bay Road. The estimated cost of constructing bike trail is $30,920 (1,546' x <br /> $20.00 per foot). The area of the trail shall be determined by subdivider's <br /> surveyor so that an additional reduction can be made to park dedication fee. <br /> 15. Applicant to execute Developer's Agreement to ensure all grading/drainage <br /> . � improvements and road improvements are installed to City's satisfaction. No land <br /> alterations can take place until erosion control is established and, septic sites <br /> fenced and the City is in receipt of final grading and road plans. No <br /> improvements can begin until City Engineer has approved all <br /> alteration/improvement plans. A Letter of Credit must accompany a fully <br /> executed Developer's Agreement written to 150% of the cost of the proposed <br /> road and site improvements. No building permits will be issued until all drainage <br /> facilities have been installed and approved and satisfactory road base completed. <br /> • <br /> 16. Per DNR report of 2/17/94, the DNR must approve all plans and specifications <br /> � prior to any construction taking place. The following improvements will be <br /> required by the DNR: <br /> a. Cleaning/upgrading of existing ditch that runs along the Luce Line <br /> adjacent to Coffm property. <br /> b. Replacing existing 18 culvert which is in disrepair. Applicant proposes <br /> �� <br /> 12" culvert at north end and 18" at southern end. <br /> c. Placing a new culvert under the horse trail in the area by the pond south - <br /> of the Dickey property. <br /> d. Install a second higher culvert through Luce Line adjacent to Coffin <br /> property to act as an overflow and to also allow minunal lowering of the <br /> • elevation of the Luce Line at this location providing applicants' plans meet <br /> the requirement that slope is no greater than 1%. <br /> The following list of fmal submittals must be submitted to the Zoning Administrator two <br /> weeks,prior to the regularly scheduled Council meeting on the second and fourth Mondays of <br /> • the month. These submittals are as follows: <br /> . Page 6 of 9 <br /> . � FamS005DiskOmno <br />
The URL can be used to link to this page
Your browser does not support the video tag.