Laserfiche WebLink
development, utility or street construction will be allowed and no building permits will be issued <br /> unless the Land is in full compliance with the approved erosion control plan. <br /> 15. GRADING PLAN. Building permits shall be based on the approved grading and <br /> erosion control plan, though actual grading will be completed by the property owners at the time <br /> of building construction. This approved grading plan will establish the Engineered Grade for the <br /> project, as defined by city code. The City will withhold issuance of building permits until all <br /> erosion control measures are in place as determined by the City Engineer. The Developer certifies <br /> to the City that all lots with house footings placed on fill will have been monitored and constructed <br /> to meet or exceed FHA/HUD 79G specifications. <br /> 16. CLEAN UP. The Developer shall clean dirt and debris from streets that has resulted <br /> from construction work by the Developer,builders, subcontractors,their agents or assigns. Prior to <br /> any construction on the Land, the Developer shall comply with all recommendations of the City <br /> staff and City Engineer regarding site cleanup and restoration, including but not limited to <br /> contaminated soil removal,junk and debris removal, etc. Also, prior to any construction on the <br /> Land, the Developer shall identify in writing a responsible party and schedule for erosion control, <br /> street cleaning, and street sweeping. <br /> 17. CONSTRUCTION AND MAINTENANCE OF IMPROVEMENTS. Upon <br /> completion of the Improvements and final acceptance by the City,the improvements lying within <br /> public easements shall become City property without further notice or action. <br /> 18. CITY ENGINEERING ADMINISTRATION AND CONSTRUCTION <br /> OBSERVATION. The Developer shall pay a fee for engineering administration. City engineering <br /> administration will include monitoring of construction observation, consultation with Developer <br /> and its engineer on status or problems regarding the project, coordination for final inspection and <br /> 6 <br />