My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Plat Development Contract
Orono
>
Property Files
>
Street Address
>
O
>
Orono Orchard Road South
>
387 Orono Orchard Road South - 02-117-23-23-0011
>
Land Use
>
Plat Development Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:07:30 PM
Creation date
7/16/2019 11:55:32 AM
Metadata
Fields
Template:
x Address Old
House Number
387
Street Name
Orono Orchard
Street Type
Road
Street Direction
South
Address
387 Orono Orchard Rd S
Document Type
Land Use
PIN
0211723230011
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12. TIME OF PERFORMANCE. The Developer shall install all Improvements as <br /> contemplated by Section 8 and the approved Plans by June 1, 2020, with the exception of the final <br /> wear course of asphalt on private drive. <br /> 13. LICENSE. The Developer hereby grants the City, its agents, employees, officers <br /> and contractors a license to enter the Land to perform all work and inspections deemed appropriate <br /> by the City in conjunction with development of the Land. <br /> 14. EROSION CONTROL. Prior to initiating site grading, the storm water pollution <br /> prevention plan, and the erosion control plan shall be implemented by the Developer and inspected <br /> and approved by the City and/or the MCWD. The City may impose additional erosion control <br /> requirements if reasonably required. All areas disturbed by excavation and backfilling operations <br /> shall be reseeded within five(5)days after the completion of the work,weather permitting,or in an <br /> area that is inactive for more than ten (10) days unless authorized and approved by the City <br /> Engineer. Except as otherwise provided in the erosion control plan, seed shall be in accordance <br /> with the City's current seeding specification which may include certified oat seed to provide a <br /> temporary ground cover as rapidly as possible. All seeded areas shall be fertilized, mulched, and <br /> disc anchored as necessary for seed retention. The parties recognize that time is of the essence in <br /> controlling erosion. If the Developer does not comply with the erosion control plan and schedule <br /> or supplementary instructions received from the City, the City may take such action as it deems <br /> appropriate to control erosion. The City will endeavor to notify the Developer in advance of any <br /> proposed action, but failure of the City to do so will not affect the Developer's and City's rights or <br /> obligations hereunder. If the Developer does not reimburse the City for any cost the City incurred <br /> for such work within ten (10) days, the City may draw down the "security" to pay any costs. No <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.