Laserfiche WebLink
4. RE-ROOFING OVER SHAKE <br /> PROCEDURE No. 7 <br /> INSTALLING GERARD FASCIA METAL <br /> rl <br /> BEND LINE(DOTTED) \ <br /> FASCIA METAL <br /> BEND LINE(DOTTED) <br /> O HIP © VALLEY <br /> ) <br /> /BEND LINE <br /> BEND LINE NAIL POINT <br /> NAIL POINT FASCIA METAL <br /> FASCIA CAN ALSO <br /> FASCIA METAL <br /> BE SECURED <br /> f THROUGH THE <br /> I FACE,CLOSE TO <br /> THE TOP BEND. <br /> PURPOSE Fit the fascia metal onto the front side of ®At the valley,fit the fascia metal into the <br /> To conceal all new framing build-up at the the fascia(first)2 X 2(50 X 50 mm)batten. valley comer by marking, cutting, and <br /> fascia. Keeping the laps tight, and nailing at the bending,then nailing. (See III.) <br /> top lip or face, work your way around the <br /> PROCEDURE fascia perimeter. Try to prevent denting <br /> and buckling of the metal. <br /> Gerard fascia metal is stone coated to A If the roof has high and low points at <br /> At h the fascia,it may be necessary to install <br /> O A the hip,fit the fascia metal around the <br /> match panels. Fascia metal is not installed P. <br /> on the rake edges;Gerard Trim covers this hip comer by marking, cutting, bending, the fascia metal in small sections to <br /> area. then nailing. (See III.) follow the roof line. <br /> GERARDO Page 36 0 Gerard Roofing Technologies,2001-03-01 <br />