My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-P04953 - re-roof
Orono
>
Property Files
>
Street Address
>
W
>
Wakefield Road
>
240 Wakefield Road - 36-118-23-31-0011
>
Permits/Inspections
>
2002-P04953 - re-roof
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:02:21 PM
Creation date
7/11/2019 1:59:12 PM
Metadata
Fields
Template:
x Address Old
House Number
240
Street Name
Wakefield
Street Type
Road
Address
240 Wakefield Road
Document Type
Permits/Inspections
PIN
3611823310011
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. RE-ROOFING OVER SHAKE <br /> PROCEDURE No. 6 <br /> INSTALLING NEW FRAMING FOR GERARD TRIM <br /> MISSION TRIM FRAMING SHAKE TRIM FRAMING <br /> FOUR 2 X 2 5"APART <br /> (OUTSIDE EDGE) 1 5�I (127mm) TWO 2 X 2 ON TOP OF EACH OTHER This method can be used with <br /> Mission Trim. <br /> O O <br /> TWO 2 X 2 5"APART '� <br /> (OUTSIDE EDGE) � I (127mm) <br /> © ONE 2 X 2 AT HIP CENTER Use this method with Shake cap <br /> © ontyl <br /> PURPOSE: <br /> To provide secure nailing points for Gerard <br /> trim at the ridge,hip,and rake areas. <br /> PROCEDURE: © / <br /> There are two types of Gerard trim: RAKE TRIM BATTEN 1 x 2 OR 2 x 2 <br /> MISSION TRIM: Installed on rakes, ridges CHECK BUILD-UP(25 x 50 or 50 x 50 mm) <br /> and hips. <br /> SHAKE CAP:Installed on rakes,ridges, o <br /> and hips. <br /> Mission and shake caps require a build-up <br /> at ridges and hips of 2' (50 mm) above <br /> battens. <br /> MISSION TRIM FRAMING <br /> RIDGES <br /> O Position two 2 X 2(50 X 50 mm)battens RAKES <br /> over the center of the ridge. Space them ® Battens at the rake area should be HIPS For Shake Caps) <br /> 5' (125 mm) apart from their outer edge. ( P ) <br /> Keeping them straight, nail them to the positioned 1"(25 mm)from the outer edge ®Position one 2 X 2(50 X 50 mm)batten <br /> counterbattens every 24" (600mm) on of the new rake framing. over the center of the hip. Keeping it <br /> Position a trim batten on top and flush with straight, nail at each batten row. Trim <br /> center. Trim at each ridge end. (See III.) the battens running down the rake edge. battens must be joined over a batten. Cut <br /> Position two additional 2 X 2(50 X 50 mm) Keeping the trim batten straight, nail at trim battens to fit and miter at ridge,fascia <br /> battens right on top of the other battens. every batten row.Cut the trim batten to fit and hip intersections. (See 111.) <br /> Space them 5' (125 mm) apart from their from the fascia to the ridge. Ensure all trim RAKES <br /> outer edge. Keeping them straight, nail battens are joined over a batten for <br /> support. See III. For shake trim batten framing at the rake, <br /> them every 2(S a 111.) )on center. Trim at ppo ( ) follow the same procedure as for mission <br /> ridge ends. (See III.) SHAKE TRIM FRAMING trim. (See III.)Refer to Special Installation <br /> HIPS(For Mission Trim) RIDGES Procedures section, "Roof-to-Wall" <br /> ®position two 2 X 2(50 X 50 mm)battens O Position a 1 X 4 (25 X 100 mm)batten flashing for Gerard Tile Pan and <br /> over the center of the hip. Space them 5" over the center of the ridge. Keeping it Rake Z-Bar details. <br /> (125 mm) apart from their outer edge. straight, nail it in place along ridge length <br /> Keeping them straight, nail them at each every 24'(600 mm). Trim at ridge ends. A Rake trim battens shall be 1°X 2". <br /> batten row. Cut the 2 X 2 (50 X 50mm) Position two 2 X 2 (50 X 50mm) battens, <br /> battens to hip length. Always join over a one at a time,over the center of the 1 X 4 <br /> batten,never between. Miter to ridge and (25 X 100 mm) batten along ridge length. <br /> fascia intersections. (See III.) Keeping them straight,nail in place every <br /> 24"(600 mm).Trim at ridge ends.(See 111.) <br /> 0 Gerard Roofing Technologies,tool-os-o1 Page 35 GERARD <br />
The URL can be used to link to this page
Your browser does not support the video tag.