My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-16-1998 Planning Commission Minutes
Orono
>
Planning Commission
>
1998
>
11-16-1998 Planning Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 2:58:49 PM
Creation date
7/10/2019 2:58:48 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ORONO PLANNING COMMISSION MEETING <br /> MINUTES FOR NOVEMBER 16, 1998 <br /> • (#2438 Michael Sletten, continued) <br /> Road for a septic area. This property is comprised of 6.51 acres and lies within the RR-1A zoning <br /> district which has a minimum of five acres. <br /> Van Zomeren stated the easements will need to be revised to take 10 feet drainage and utility <br /> easements along the new exterior lot lines of the parcel and vacate the old easements. The Applicant <br /> will also need to obtain a consent form from his mortgage company to sell a portion of the property <br /> to the adjacent property owner. <br /> Sletten commented he was waiting for the resolution to be approved. <br /> There were no public comments. <br /> Schroeder moved, Berg seconded,to approve Application #2438, 4680 Bayside Road, granting <br /> of a lot line rearrangement to accommodate a non-conforming lot by selling .25 acres to his <br /> adjacent neighbor at 4720 Bayside Road for a septic area. VOTE: Ayes 7, Nays 0. <br /> (#10) #2439 SERVICE 800, INC., 2190 WEST WAYZATA BOULEVARD, CONDITIONAL USE <br /> PERMIT AND COMMERCIAL SITE PLAN, 8:50 p.m. - 10:17 p.m. <br /> The Certificate of Mailing and Affidavit of Publication were noted. <br /> Jean Mork Bredeson, Service 800; Charles Radloff, Architect, and Rich Kiemen were present. <br /> • Gaffron stated this application is requesting approval of variances and commercial site plan <br /> approval for the construction of a 10,880 square foot office building on Lot 1, Block 1, Sugar Woods <br /> Second Addition as well as approval for a conditional use permit for office use in the B-1 District. <br /> Gaffron remarked the Applicant is proposing variances to lot coverage of 26.1 percent where 15% is <br /> allowed, 36 parking stalls where 45 stalls are required, and variances to parking lot setbacks. The <br /> Applicant is requesting a variance to omit a loading berth. <br /> The Applicant is required to submit plans for access to Highway 12 to MnDot for review and <br /> approval, with access being proposed to be through the triangular portion of MnDot right-of-way just <br /> west of the property. The parking lot grades should be reduced from the proposed 5 percent to <br /> 4 percent, and construction of a retaining wall may be needed along the east lot boundary line, as <br /> well as a construction easement since the storm sewer and parking lot are so close to the side <br /> lot line. Storm sewer calculations and a drainage area map will need to be submitted. Gaffron <br /> noted this site is required to be connected to City sewer and water, and an expanded utility <br /> easement will be needed over the existing City water line along the west property line. <br /> Gaffron stated the Applicant is not proposing at this time to create an access between this site <br /> and the adjacent Orono Shopping Center site. A rear access driveway is not necessary at this <br /> time, but the site plan allows for a future driveway. A fence or hedging along the rear line of the <br /> property is also not required at this time. <br /> The Applicant is proposing landscaping around the building, with green space constituting <br /> approximately 25 percent or 34 percent of the site depending on the parking scheme chosen. <br /> Gaffron remarked that snow storage is likely to become an issue if the parking lot is fully utilized <br /> • for parking, and a lighting plan will need to be submitted. The proposed signage appears to be in <br /> conformance with the limitation of 145 square feet total, with the Applicant proposing signage of <br /> Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.