Laserfiche WebLink
. ORONO PLANNING COMMISSION MEETING <br /> MINUTES FOR APRIL 20, 1998 <br /> (#3 - #2355 Susan and Douglas Van Moorlehem- Continued) <br /> to confirm the wetland area. The Class III subdivision is subject to park dedication fees and requires <br /> an easement and covenant over the wetlands. The City Engineer's report states the need for drainage <br /> area calculations and a grading plan. In summary, the dry buildable acreage needs to be confirmed <br /> for Lot 1, Block 1. A lot combination is recommended for Lots 1 and 2, Block 3 to be combined as <br /> a single 6 acre lot. Also applicant needs to provide stormwater/drainage calculations to confirm that <br /> there is no need for stormwater ponding. Staff recommends approval of the preliminary plat as <br /> described. <br /> Douglas Van Moorlehem said there are no immediate plans to build on the southern lots. <br /> Gaffron explained a park fee would be due with the application. The park dedication fee could be <br /> delayed if some of the lots were platted as outlots now but eventually a future platting process would <br /> be required to change the status of the outlots into buildable lots. Lindquist mentioned the <br /> possibility of the lots not meeting future zoning requirements if the rules change. Gaffron suggested <br /> the option of paying the park fee at the time the building permit is issued as long as the lots are not <br /> going to be immediately built on. Van Moorlehem asked the amount of the park fee. Gaffron stated <br /> • it is calculated at 8% of the undeveloped value of the land or a minimum of$2,900 per lot or a <br /> maximum of$4,900 per lot. If the property is platted with lots,the park dedication fee is determined <br /> now. Van Moorlehem agreed to have the lots platted as buildable lots. <br /> Smith asked for public comments. <br /> Norbert Johnson of 4520 Watertown Road expressed a concern that a change in the topography <br /> would cause a drainage problem on his property. <br /> Gaffron stated there are no plans to change the topography. <br /> Schroeder moved, McMillan seconded, to approve Application #2355 for a 3 lot residential <br /> subdivision as outlined in staffs memo of April 13, 1998 stating the need to confirm the amount of <br /> dry buildable acreage. If it is not 5 acres, a variance will be recommended. Lots 1 and 2, Block 3 <br /> will be platted as a single 6 acre lot. Driveway access locations to be subject to approval of the <br /> Public Services Director. Confirmation is needed that there will be no drainage changes. The <br /> standard plat conditions apply along with the usual assessment of park dedication fees. Vote: Ayes <br /> 6,Nays 0. <br /> Gaffron explained the Park Commission will be reviewing the City's trail plan along McCulley <br /> Road. <br /> • 5 <br />