My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-18-1996 Planning Commission Minutes
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Minutes
>
1990-1999
>
1996
>
11-18-1996 Planning Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 2:10:29 PM
Creation date
7/10/2019 2:10:27 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />MINUTES OF THE ORONO PLANNING COMMISSION <br />MEETING HELD ON NOVEMBER 18, 1996 <br />( #8 - #2193 MCWD - Continued) <br />Gaffron reported that the application for conditional use permit by the MCWD pertains to <br />a project located northeast of the cul -de -sac of Creekwood Trail. The 100 acre wetland <br />flows southward through Minnetrista to Jennings Bay. The LMCD petitioned the MCWD <br />in 1975 to construct an upper watershed storage and retention project to improve the <br />overall water quality. The MCWD completed such a project in 1985 including detention <br />ponds and work on the channel. Maintenance excavation is now needed, and MCWD <br />proposes to expand the boundaries of the South Katrina Pond and change the outlet which <br />will change the nature of the flow. Syverson said the flow would be taken in at different <br />velocities. <br />Gaffron indicated there are existing easements for the stormwater pond and access to it. <br />The MCWD plans to protect the wooded site and identified burial mounds. He indicated <br />that the access point is proposed to be north of the two driveways. Gaffron suggested <br />there may be another way to access the area for less impact on the drainage structure at <br />the access point. The intent, however, is to bring equipment up the creek bed in order to <br />expand the pond. A few trees may need removal but in the restricted area within 75' of <br />the creek, tree replacement would be required for 6" or more diameter replaced with 2" or <br />more diameter trees. <br />• Gaffron stated that the location of the burial mounds to the north had already resulted in a <br />redesign of the expansion to maintain appropriate setbacks. The 400 dump loads which <br />will be leaving the site are also a concern. It is a private road, and the MCWD will work <br />with the neighbors regarding this issue to gain their approval. <br />• <br />Gaffron indicated the project is planned to begin in January, 1997 and will require one <br />month's time for completion. Due to the nature of the pond, more maintenance will be <br />required in 5 -10 years. During the Staff review, it was also noted by MCWD that more <br />work will be required down stream in the creek bed. Staff recommends approval of the <br />proposed pond maintenance and expansion project subject to conditions 1 -10 as noted in <br />the memo. The MCWD is working with Minnetrista and Independence to gain permits for <br />spoil disposal sites in their area. <br />Gaffron recommended an additional condition ( #11) be considered, to approve the <br />proposal to clean out the creek bed subject to Staff review through a land alteration permit <br />or brought back before the Commission if found to be more than a minor project. Maple <br />said the MCWD was prepared to meet all of the conditions adding that they were also in <br />favor of the tree replacement. Maple noted that they have had two public hearings and <br />have worked with the fee owners of the site. <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.