My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-16-1996 Planning Commission Minutes
Orono
>
Planning Commission
>
1996
>
01-16-1996 Planning Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 1:57:38 PM
Creation date
7/10/2019 1:57:36 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�J <br />MINUTES OF THE ORONO PLANNING COMMISSION <br />MEETING HELD ON JANUARY 16, 1996 <br />( #15 • #2103 Orono Hockey Boosters - Continued) <br />The application proposes a 160'x240' enclosed ice arena located 50' from the west lot line, <br />50' from the north, and 150'+ from either the south or east lot lines. A 130 stall parking <br />lot is proposed to the south of the arena. The property is in a residential zone. The <br />parking lot will be subject to residential setbacks. It's location 20' from the front line, <br />typical of commercial properties, will require a variance. <br />Height of the building is also an issue. Finished grade heights are proposed at 28' at the <br />west lot line, 41.5' at the east, 35.5' at the south, and 41' to the north. Mabusth clarified <br />these were peak heights and not mean heights, although, a height variance will be <br />required. <br />Another issue with the application is the lack of sewer. The sewer question should, <br />however, be resolved by permit time in April when construction is to begin. Mabusth said <br />the City should be in receipt of Met Council's position by March. <br />Lindquist asked if plans work out as now set forth, a sewer connection should be made. <br />Mabusth said this is unknown at this point. Gaffron said there is a 60 day time frame for a <br />yes or no answer, but it could be extended. Mabusth said the City could know if the land <br />has been approved for sewer within 4 months. A variance for a holding tank is being <br />• requested if the need should arise. When asked by Lindquist if the holding tank would be <br />done, Engebretson said he did not know. Due to the high cost, Engebretson said the start <br />date would probably be delayed. Smith inquired of the cost. Engebretson said in terms of <br />the total cost of the project, it was not major. Mabusth said, according to Gaffron and <br />Weckman, it was impossible to locate septic on the site and additional testing may be <br />required on the school property. It was agreed that the proposed use would not occur <br />without sewer service. <br />• <br />Mabusth inquired about the cost of the facility, it's funding, and lease option, which <br />required a 90% of funds to allow construction to begin. Engebretson said the total budget <br />for the project was slated at 2 -1/2 million dollars, complete, on the school district <br />property, consisting of an Olympic size sheet of ice. The arena would open with a reserve <br />of $100,000. The operating feasibility was considered to be the least of concerns for the <br />Boosters. <br />Engebretson reported that the cost estimate for the ice arena included the parking and <br />paving improvements. Engebretson said the arena could be opened at a cost of 2 million <br />dollars with some interior work needing completion. <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.