My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-16-1996 Planning Commission Minutes
Orono
>
Planning Commission
>
1996
>
01-16-1996 Planning Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 1:57:38 PM
Creation date
7/10/2019 1:57:36 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br />MINUTES OF THE ORONO PLANNING COMMISSION <br />MEETING HELD ON JANUARY 16, 1996 <br />k414 - 421U4 B. Scott Hall - Continued) <br />Gaffron continued that the proposal calls for lot area, lot width, and average lakeshore <br />setback variances. The property consists of .88 acres in the 2 -acre zoning district. The <br />property does not meet the 200' lot width requirement with 180' width and 163' at the 75' <br />line. The 75' setback is met. The proposal is for a conforming 30' side setback. The <br />hardcover needs to be adjusted slightly to meet the 25% limit. Gaffron reported that the <br />existing house is located all in front of the average lakeshore setback line. The proposed <br />house would be located with a slight encroachment of that line but has no impact on lake <br />views enjoyed by the neighboring properties. <br />Gaffron noted that the new plan has not yet been reviewed by the City Engineer. The <br />garage proposed at 938' would need to be contoured to the 940' elevation. Three feet of <br />fill would be required to the basement level to bring the elevation from 932.5' to 935' to <br />meet the flood plain requirements. The fill would need to come up to the driveway. <br />Gaffron said the City files show a historic concern with the drainage to the neighboring <br />property to the east. This will be reviewed by the Engineer so as not to impact the <br />neighbors. Gaffron said the Engineer's review will occur prior to the application going <br />before the Council.. <br />Stickney noted that there was very little slope or elevation change to the proposal. <br />Lindquist moved, Hawn seconded, to recommend approval of Application #2104 with the <br />hardcover meeting the 25% allowed, the drainage and grading plans to be reviewed and <br />approved by the Engineer prior to final Council action. Vote: Ayes 4, Mays 0. <br />SKETCH PLAN REVIEW <br />( #15) #2103 ORONO HOCKEY BOOSTERS, INC., 1025 OLD CRYSTAL BAY <br />ROAD NORTH - CONCEPTUAL PLAN REVIEW <br />Mabusth noted that the agenda item was for conceptual review not requiring any action. <br />Present were Mark Engebretson, president of the Orono Hockey Boosters, and Ted <br />Rozeboom, architect for the ice arena. The land under consideration for the ice arena is a <br />4.4 acre parcel owned by the school district. The school district has not legally combined <br />all of their owned parcels and have buildings and uses that expand from one parcel to <br />another. A lease period of 35 -55 years is proposed with an option to purchase at any <br />time. Mabusth said the major issue for this application is a land use matter as there is no <br />exact fit for this use within the City code. <br />21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.