My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-17-1995 Planning Commission Minutes
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Minutes
>
1990-1999
>
1995
>
04-17-1995 Planning Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 1:46:14 PM
Creation date
7/10/2019 1:46:13 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />MINUTES OF THE ORONO PLANNING COMMISSION <br />MEETING HELD ON APRIL 17, 1995 <br />( #8 - #2011 Tim & Lori Line - Continued) <br />The Applicants were present and were represented by their architect, Blake Bichanich of <br />Keith Waters & Associates. <br />Mabusth reported that the commission originally dealt with this undeveloped property in <br />1993 granting hardcover and height variances. Excesses in hardcover were to be offset <br />with the installation of a drainfield. The current proposal also involves a hardcover <br />variance and height variance for an observation tower located in the middle of the <br />structure. A drainfield to the west will treat runoff from 20 +% of total hardcover <br />requests. <br />Mabusth also noted a gain of area due to a redefinition of the shoreline at the 929.4 <br />elevation on the new survey. Staff reviewed the surveyor's field notes and finally accepted <br />the surveyor's findings lacking any specific criteria for defining shorelines adjacent to <br />wetlands either within the City's or DNR regulations. <br />Mabusth clarified how the height of the building is determined. The legal height of the <br />highest part of the roof, the observation tower, is 35'. The structure is 47' at the peak <br />height from the lakeview. The tower is planned in order to gain more light with the <br />• interior of the structure. <br />Bichanich commented to the members that the tower, although needing a height variance, <br />is limited in its affect on the area. The applicant could add volume to the home, which <br />would create a more massive look, without requiring any height variance. <br />It was noted that 201/o of the hardcover would be treated through the drainfield system. <br />Nolan asked the applicant how this is controlled. Bichanich advised there would be four <br />1000 gallon runoff tanks, which would be equipped to take in 2" of runoff in a one -hour <br />span. Beyond that time and amount, the excess runoff would leech into the surrounding <br />ground. A pump with valves would pump out any sediment. A check valve would be <br />installed to eliminate any backup of the system. If the system is overburdened, this would <br />result in an overflow spilling out onto the lawn. <br />Schroeder questioned if the house plan was worth the cost to install the treatment area. <br />The architect responded that without the treatment, the result would have been a one -third <br />reduction in the size of the home. <br />During public comments, Mrs. Erickson of Forest Lake Landing asked the location of the <br />dock. Erickson was concerned with the wetland areas. <br />Tim Line reported approval of the plans from two neighbors, and the letters of approval <br />• were read into the record by Peterson. <br />
The URL can be used to link to this page
Your browser does not support the video tag.