My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-17-1995 Planning Commission Minutes
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Minutes
>
1990-1999
>
1995
>
04-17-1995 Planning Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 1:46:14 PM
Creation date
7/10/2019 1:46:13 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF THE ORONO PLANNING COMMISSION <br />MEETING HELD ON APRIL 17, 1995 <br />s <br />(#6 - #2009 Tom & Maureen Palm - Continued) <br />Schroeder moved, Lindquist seconded, to approve Application #2009 with the principal <br />structure meeting the 50' setback. Schroeder noted the existing variances, the effort by <br />the applicant to reduce hardcover, the hardships of the lot, the impracticality of setting the <br />new construction at the 75' mark, and the fact that the drainage is away from the lake. <br />Ayes 5, Nays 2, Rowlette and Smith, both prefer the 75' setback. <br />( #7) #2012 JAMES JUNDT, 1420 BRACKETTS POINT ROAD - VARIANCE - <br />PUBLIC HEARING 8 :16 -8 :23 P.M. <br />The Certificate of Mailing and Affidavit of Publication were noted. <br />Scott Crawford of Kraus Anderson Construction represented the applicant. <br />Mabusth reported that the application is for repairs to the oversized accessory structure <br />with the expansion of the roof area. This guesthouse portion of the structure is adjacent <br />to the greenhouse area, and the new roof will be at the same height as the greenhouse roof <br />line. A conditional use permit for the caretaker house was approved in 1993. The last <br />issue involving this structure did not involve the guesthouse portion of structure located <br />within a sub standard side setback. Now, because of structural repairs being done, a side <br />setback variance is required. <br />Crawford reported that the plan is for roof expansions, roof repairs, repair, replacement of <br />windows, tuckpointing, and new gutters. <br />Lindquist asked what is going to be done with the peaked roof area of the structure. <br />Crawford advised an apartment now exists and an expansion of the living area is planned. <br />The structure would be used for guests only. <br />There were no public comments. <br />Peterson reiterated the need for an overall plan to eliminate separate issues coming before <br />the commission each month. <br />Rowlette moved, Lindquist seconded, to approve Application #2010 for a side setback <br />variance and repair to the oversized accessory structure. Ayes 7, Nays 0. <br />( #8) #2011 TIM & LORI LINE, 4415 FOREST LAKE LANDING - VARIANCES - <br />PUBLIC HEARING 8:23 -8:59 P.M. <br />• The Certificate of Mailing and Affidavit of Publication were noted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.