Laserfiche WebLink
CITY OF ORONO <br /> RESOLUTION OF THE CITY COUNCIL <br /> NO. 6990 <br /> `9kESH0 <br /> 7. The parcel will be subdivided into 2 buildable lots. All lots conform to the size and width <br /> requirements of the city code. <br /> 8. Access to the property is via the existing private driveway off of Stubbs Bay Road North. This <br /> driveway will be converted to a private road in accordance with the Subdivision requirements. <br /> 9. The Parks,Trails and Open Space element of the Orono Community Management Plan(CMP)has <br /> no current plans for parks that specifically require dedication of park land from this property. <br /> CONCLUSIONS.ORDER AND CONDITIONS: <br /> Based upon one or more of the above findings,the Orono City Council hereby grants preliminary <br /> plat approval to allow the subdivision of the property into 2 lots, as depicted on the plans dated Feb 26, <br /> 2019,last revised June 5,2019 prepared by Sathre-Berquist,attached as Exhibit B,subject to the following <br /> conditions: <br /> A. Project Specific Conditions <br /> 1. Applicable general engineering comments and or conditions provided by City Engineer <br /> shall be suitably addressed by applicant. <br /> 2. Easements shall be provided as required by the City Engineer. <br /> 3. Upon evidence of pre-settlement history, the developer will contact the city and the State <br /> Historical Preservation Office prior to proceeding. <br /> 5. The following estimated fees are due at the time of final plat unless otherwise noted. These <br /> fees are based on the 2019 Fee schedule and the fee schedule in effect at the time of Final <br /> Plat approval will govern. <br /> a. Stormwater and Drainage Trunk: The property will be subject to the Stormwater and <br /> Drainage Trunk Fee(SW&DT Fee)of$8,060(Number of new lots(1)times per lot amount <br /> ($8,060)). <br /> b. Sewer: Not Applicable <br /> c. Water: Not Applicable <br /> d. Park dedication: $5,550 ($5,550 x 1 new lot). <br /> Total: $13,610.00 <br /> 2 <br />