Laserfiche WebLink
00"")e C) I <br /> I <br /> J.H. Dahlmeier Engineering Inc. <br /> October 15, 1998 REVISED 10/20/98 <br /> David Earley, Contractor <br /> 4702 69'Ave.No. <br /> Brooklyn Center,MN 55429 <br /> Re: Tim&Jill Bresnahan Residence <br /> 1500 Vine Place <br /> Orono, MN <br /> Commission No. 98236 <br /> Gentlemen: <br /> The purpose of this letter is to report the findings of a structural engineering design for <br /> remodeling at the Bresnahan residence. <br /> ASSIGNMENT <br /> J. H. Dahlmeier Engineering Inc. has been retained to provide a structural engineering design for <br /> a new beam between the living room and south family room of the structure at 1500 Vine Place, <br /> Orono, MN as directed by David Earley, contractor for the project. <br /> BACKGROUND <br /> David Earley is the contractor for remodeling of this residence. <br /> The owners wish to remove the bearing wall between the living room and the south family room. <br /> OBSERVATIONS AND COMMENTS <br /> 1. A site visit was conducted by John H. Dahlmeier of J. H. Dahlmeier Engineering Inc. on <br /> October 13, 1998 to review existing conditions. <br /> 2. Measurements were taken with respect to the design assignment. <br /> 2434 Commerce Boulevard 0 Mound, MN 55364 (612') 472-4746 0 PAY (Ra 91 d71)_A791 <br />