Laserfiche WebLink
NO <br /> CITY of ORO <br /> Municipal Offices <br /> Mailin Address: <br /> Street Address: g <br /> l �,, , P.O. Box 66 <br /> 4kES7rI0 2150 Kelley Parkway <br /> Orono, MN 55356 Crystal Bay, MN 55323.0066 <br /> January 6, 1994 <br /> Mr. Douglas Merz <br /> 380 Turnham Road <br /> Maple Plain, Minnesota 55359 <br /> Dear Mr. Merz: <br /> Due to the extremely wet year, we realize that the required repair of your septic system may <br /> have been difficult to complete last summer. This is a reminder that the septic system repair <br /> will be required next year. <br /> A licensed septic contractor must get a permit-from the City of Orono by July 15, 1994 for the <br /> repair of your septic system. The procedure for completing septic system repairs is shown <br /> below. Please contact me at the City offices if there are any questions. <br /> PROCEDURE FOR SEPTIC SYSTEM REPAIR <br /> 1. Hire a Site Evaluator/System Designer to do the soil testing and system design. <br /> 2. Submit the design to the City for approval. <br /> 3. Once the design is approved, have one or more contractors bid on the approved design. <br /> 4. The contractor you choose should then obtain a permit from the City before starting work. <br /> He will call the City for the required inspections. <br /> Sincerely, <br /> Stephen Weckman <br /> On-Site Systems Manager <br /> SW/ch <br /> Enc. Septic Report <br /> List of Septic Contractors and Site Evaluators/Designers <br /> Telephone (612) 473-7357 9 FAX 473-0510 <br />