My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: engineering review
Orono
>
Property Files
>
Street Address
>
T
>
Turnham Road
>
125 Turnham Road - 31-118-23-43-0018
>
Correspondence
>
Re: engineering review
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:33:00 PM
Creation date
7/1/2019 1:37:56 PM
Metadata
Fields
Template:
x Address Old
House Number
125
Street Name
Turnham
Street Type
Road
Address
125 Turnham Road
Document Type
Correspondence
PIN
3111823430018
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Narrative <br /> A. Schedule <br /> a. Begin Construction 2/456022 11P/391Z <br /> b. Substantially complete grading activities 3 -71.3olZol0 <br /> c. Substantially complete constructior f J/3o/yon L- <br /> B. A grading contractor has not been selected,once on is information will be provided <br /> C. In order to establish permanent cover,topsoil is to be stripped and respread and seeded <br /> Inspection and Notification Agreement: <br /> (1)The individual identified as being responsible for implementing the erosion control plan must routinely <br /> inspect the construction site once every seven days during active construction and within 24 hours after a <br /> rainfall event greater than 0.5 inches in 24 hours. <br /> (2)All inspections and maintenance conducted during construction must be recorded in writing and these <br /> records must be retained with the erosion control plan and made available at the District's request within 24 <br /> hours. Records of each inspection and maintenance activity shall include: <br /> (i)Date and time of inspections; <br /> (ii)Name of person conduction inspections; <br /> (iii)Findings of inspections, including recommendations for corrective actions: <br /> (iv)Corrective actions taken(including dates,times and party completing maintenance activities);and <br /> (v)Date and amount of all rainfall events greater than 0.5 inches in 24 hours. <br /> (b)NOTIFICATION. The applicant or its authorized agent shall notify the District in writing at the <br /> following points(large public projects may request alternative notification processes that may include <br /> maintenance on an on site written log of the following points): <br /> (1)On completing installation of perimeter erosion and sedimentation controls. <br /> (2)On completing land-disturbing activities and putting into place measures for final soil stabilization and <br /> revegetation. <br /> (3)Whenever any site dewatering is proposed to take place. <br /> (4)When the site has been permanently stabilized and re-vegetated. <br /> (5)When all temporary erosion and sedimentation controls have been removed from the site. <br /> Anthony Rochel <br />
The URL can be used to link to this page
Your browser does not support the video tag.